Tuesday, April 29, 2014
- Agenda
- CoBo firmware updates (Nathan)
- Overview of PAC 38 responses
Tuesday, April 22, 2014
- Agenda
- GET Configuration Program (Daniel)
- AT-TPC pulser data analysis (Saul)
Tuesday, April 15, 2014
- Agenda
- Noise measurement for GET and AT-TPC (Wolfi)
Tuesday, April 8, 2014
- Agenda
- Trigger geometry generation program (Daniel)
- Pad position convention update (Tan)
- Update on firmware issues (Faisal)
- Prototype gas test start (Saul)
Tuesday, April 1, 2014
- Agenda
- Commissioning Experiment Overview
Tuesday, March 18, 2014
- Agenda
- Commissioning Experiment Status
Tuesday, March 11, 2014
- Agenda
- Magnet cooling stopped (Daniel)
- Prep for next week's commissioning run
Tuesday, March 4, 2014
- Agenda
- Detector gas handling connected
- Micromegas pulser test (Daniel)
Tuesday, February 25, 2014
- Agenda
Tuesday, February 18, 2014
- Agenda
- Micromegas fitting problem (Daniel)
- DAQ trigger/time stamp
Tuesday, February 11, 2014
- Agenda
- AT-TPC attached to beamline/Hall probe and source arm installed (Daniel)
- Micromegas conditioning started (Saul)
- LN2 filling of magnet started (Daniel)
Tuesday, February 4, 2014
- Agenda
- Received 1st Micromegas (Daniel)
- AT-TPC setup vacuum considerations
- DAQ status (Faisal)
- Mutant/Firmware issues (Nathan)
Tuesday, January 28, 2014
- Agenda
- Micromegas update (Daniel)
- ZAP and shielding (Faisal, Daniel)
- Firmware update (Nathan)
Tuesday, January 21, 2014
- Agenda
Tuesday, January 14, 2014
- Agenda
- Micromegas manufacturing timeline (Daniel)
- CoBo testing (Faisal)
Tuesday, December 17, 2013
- Agenda
- Fusion cross sections for 124Sn experiment (Tan)
- Work with Mutant firmware for CoBo (Nathan)
- Start on ZAP design (Faisal)
Tuesday, December 10, 2013
- Agenda
- Endplate holder fixed (Daniel)
- Micromegas attachment discussion
Tuesday, December 3, 2013
- Agenda
- Planning for February AT-TPC run
- Endplate holder on cart to be fixed (Daniel)
Tuesday, November 26, 2013
- Agenda
- Micromegas details (Faisal)
- AT-TPC test experiment discussion
- Notre Dame 12B results (Saul)
Tuesday, November 19, 2013
- Agenda
- Placement of AT-TPC on cradle and cart and in solenoid (Daniel)
- Discussion on Micromegas
Tuesday, November 12, 2013
- Agenda
- Progress on AT-TPC cart and cradle (Daniel)
- Shutter doors being made, discussion on laser holes
Tuesday, November 5, 2013
- Agenda
- AT-TPC vacuum test with new copper plates (Daniel)
- AT-TPC cart assembly started
- 124Sn(p,p) data (Tan)
Tuesday, October 29, 2013
- Agenda
- AT-TPC vacuum testing (Daniel)
Tuesday, October 22, 2013
- Agenda
- End plate modifications (Daniel)
- CoBo's received
Tuesday, October 15, 2013
- Agenda
- AT-TPC chamber pumping test (Daniel)
- AsAd cooling discussion
Tuesday, October 8, 2013
- Agenda
- End flange seal mounted, plan to pump detector (Daniel)
Tuesday, October 1, 2013
- Agenda
- AT-TPC assembly, Field cage, HV contact, accelerator tube assembled (Daniel)
- Micromegas traces (Faisal)
- ANL resonance histogram (Tan)
Tuesday, September 24, 2013
- Agenda
- Accelerator tube and cathode assembly update (Daniel)
- 10Be angular distributions (Adam)
- STPC GET test results (Genie)
Tuesday, September 17, 2013
- Agenda
- Field cage and accelerator tube assembly update (Daniel)
- STPC GET test (Zibi)
Tuesday, September 10, 2013
- Agenda
- Accelerator tube assembly and last potential ring connection (Daniel)
- 10Be analysis update (Adam)
Tuesday, August 27, 2013
- Agenda
- AT-TPC detector assembly (Daniel)
- 3 AsAd test (Nathan)
Tuesday, August 20, 2013
- Agenda
- LHe liquifier received (Daniel)
- Assembly plans, leak checking going on (Daniel)
- ANL analysis update (Tan)
- Micromegas, CoBo firmware update (Faisal, Nathan)
Tuesday, August 13, 2013
- Agenda
- Notre Dame experiment summary (Tan)
- Update on AT-TPC parts (Saul)
- CoBo firmware update (Nathan)
- Discussion on tracking and visualization
Tuesday, July 23, 2013
- Agenda
- CoBo network and memory performance (Faisal)
- ND experiment prep (Saul)
- Test chamber results (Maxime, Elodie)
- Fission data analysis (Guillaume, Cathleen)
Tuesday, July 16, 2013
- Agenda
- Detector field cage assembly (Daniel, Josh)
- CoBo ethernet and firmware (Faisal, Nathan)
- ANL experiment analysis update (Tan)
- Test chamber fission measurement (Cathleen, Guillaume)
Tuesday, July 9, 2013
- Agenda
- Detector cathode assembly (Daniel, Josh)
- CoBo firmware update (Faisal, Nathan)
- Discussion about upcoming ND alpha decay run
- Cf source holder (Maxime)
Tuesday, July 2, 2013
- Agenda
- AT-TPC fabrication update (Daniel)
- ANL analysis update (Tan)
- Cf source measurements (Cathleen, Guillaume)
Tuesday, June 25, 2013
- Agenda
- Neural network work (Josh)
- 10Be analysis (Adam)
- CoBo testing (Faisal)
- 3-body decay charge deposit calculations (Guillaume)
Tuesday, June 18, 2013
- Agenda
- Introduction of 3 new students (Daniel)
- Field cage development update (Daniel)
- Summer experiment at Notre Dame (Saul)
- Laser testing results with test chamber (Maxime)
- Alpha range calculation for 12C 3-alpha decay (Guillaume)
- CoBo firmware update (Faisal)
- Multiplicy trigger update (Nathan)
- Measurements with fission source (Wolfi)
Tuesday, May 28, 2013
- Agenda
- Field cage development update (Daniel)
- Solenoid cooling update (Daniel)
- Laser testing results with test chamber (Saul)
- Diffusion calculation for 12B experiment (Maxime)
- Alpha range calculation for 12C 3-alpha decay (Guillaume)
- CoBo firmware update (Nathan)
Tuesday, May 21, 2013
- Agenda
- Status of LHe fill of Solenoid (Daniel)
- CoBo testing update (Faisal)
- 12C 3-body decay simulation (Wolfi)
- Laser testing started (Saul)
Tuesday, May 14, 2013
- Agenda
- m-CoBo update, DDR2 memory, Flash, etc. test (Faisal)
- ANL analysis update (Tan)
- AT-TPC fabrication update (Daniel)
- Transfer LN2 to LN2 shield from He vessel (Daniel)
Tuesday, May 7, 2013
- Agenda
- Solenoid cooling status (Daniel)
- Laser safety review and future test plans (Saul)
- CoBo testing update (Daniel)
Tuesday, April 30, 2013
- Agenda
- CoBo shipping update (Daniel)
- 10Be analysis update (Adam)
- Solenoid cooling started (Daniel)
- ANL upcoming experiment update (Tan)
- Work started on UV laser (Wolfi)
Tuesday, April 23, 2013
- Agenda
- Field cage update (Daniel)
- Experiment plans, ANL, Notre Dame
- Diode protection circuit discussion
- Update on time differences for ANL data (Tan)
Tuesday, April 16, 2013
- Agenda
- Field cage measurements (Daniel)
- ANL data sorting (Tan)
- CoBo Power (Faisal)
Tuesday, April 9, 2013
- Agenda
- Field cage cleaned (Daniel)
- ANL experiment magnetic field considerations
- plan to cool solenoid (Daniel)
- firmware adapting to full CoBo (Faisal)
- CoBo clock architecture (Faisal)
Tuesday, April 2, 2013
- Agenda
- 124Sn Argonne test run update (Daniel)
- Field cage machined and received
- CoBo v.0.2 memory (Faisal)
- Gas handling update (Zach M)
Tuesday, March 12, 2013
- Agenda
- 10Be data analysis update (Adam)
- ANL experiment details (Tan)
- progress on multiplicity trigger (Nathan, Tan)
Tuesday, March 5, 2013
- Agenda
- ANL experiment details (Tan)
- discussion on multiplicity trigger, sparking limit for Sn beams at ANL
- CoBo design update (Faisal)
- AsAd's ordered (Daniel)
- Discussion of card shielding
Tuesday, February 26, 2013
- Agenda
- ANL experiment scheduled (Tan)
- Multiplicity trigger discussion
- CoBo progress (Faisal)
Tuesday, January 22, 2013
- Agenda
- AT-TPC Project Timeline (Daniel)
- Notre Dame experiment prep
- CoBo memory debugging (Faisal)
Tuesday, January 15, 2013
- Agenda
- CoBo work, VxWorks image generation (Faisal, Shelbi, Patrick)
- Discussion of mesh signals for fission fragments
Tuesday, January 8, 2013
- Agenda
- New Micromegas update
- Notre Dame experiment scheduled
Tuesday, December 11, 2012
- Agenda
- Field cage received (Daniel)
- Drawings submitted to shop
- Cobo development update (Faisal)
- Prototype Micromegas design update (Saul)
Tuesday, December 4, 2012
- Agenda
- GET controller and Micromegas testing (Tan, Ian)
- Micromegas design update (Faisal)
Tuesday, November 27, 2012
- Agenda
- AT-TPC event generator (Daniel)
- GET software update (Tan, Nathan)
- Prototype Micromegas pad design (Saul)
- Cobo Gigabit ethernet (Faisal)
Tuesday, November 20, 2012
- Agenda
- Detector drawing almost approved (Daniel)
- Prototype Micromegas Pad design (Saul)
- CoBo Gigabit work (Faisal)
Tuesday, November 13, 2012
- Agenda
- AT-TPC cart design (Daniel)
- GET Controller software updated (Nathan)
Tuesday, November 8, 2012
- Agenda
- Plans to order AGET chips (Daniel)
- GET debugging (Nathan)
Tuesday, October 30, 2012
- Agenda
- AT-TPC fabrication progress (Daniel)
- Gas handling update (Zach)
Tuesday, October 23, 2012
- Agenda
Tuesday, October 16, 2012
- Agenda
Tuesday, October 9, 2012
- Agenda
- AT-TPC design approval in process (Daniel)
- Saclay AsAd 1.1 test after repair (Tan)
- CoBo firmware updated for use with multiple reduced CoBo's (Nathan)
- MCP testing setup (Adam)
Tuesday, October 2, 2012
- Agenda
- Fixed regulator for Saclay AsAd 1.1 (Tan)
- Agiltron test (Saul)
- Reduced CoBo update (Nathan)
- Micromegas PCB update (Faisal)
- 8Be kinematics (Aimee)
Tuesday, September 25, 2012
- Agenda
- Comparison of Daisuke's analysis of 6He elastic scattering data (Aimee)
- Saclay AsAd 1.1 testing (Tan, Aimee, Nathan)
- CoBo firmware for ethernet frames update (Nathan)
- CoBo processor status (Faisal)
Tuesday, September 18, 2012
- Agenda
- Field cage fabrication started (Daniel)
- Hit pattern and thresholds test for GET (Tan, Aimee)
- New pump and compressor update (Zach)
- MCP testing setup (Adam)
- Pad design (Faisal)
Tuesday, September 11, 2012
- Agenda
- AT-TPC source arm design update (Daniel)
- Test chamber data, micromegas troubleshooting (Tan, Aimee)
- CoBo update and micromegas pad design (Faisal)
Tuesday, September 4, 2012
- Agenda
- GET electronics, testing saturation problem (Tan, Aimee)
- Gas handling, compressor and pump update (Zach)
- 10Be analysis (Adam)
- Pad design implementation status (Faisal)
Tuesday, August 28, 2012
- Agenda
- AT-TPC magnet yoke assembled and put in place (Daniel)
- AT-TPC design updates, Gas flow tube size for flow rate (Daniel)
- Ring cutter design (Daniel)
- GET multiplicity measurements (Tan, Aimee)
Tuesday, August 14, 2012
- Agenda
- GET testing update (Tan, Aimee)
- 10Be analysis (Adam)
- Field cage ring construction (Ian, Wolfi)
- CoBo update (Faisal)
Tuesday, August 7, 2012
- Agenda
- Fission source measurements (Remi, Malek, Tan)
- GET software problems
- Pad plane design, research on laser, AT-TPC Mechanical Design Review (Saul)
- 10Be + alpha data analysis update (Adam)
- CoBo, DDR memory testing (Faisal)
Tuesday, July 31, 2012
- Agenda
- Problems and progress on fission source measurement in test chamber (Remi, Malek, Tan)
- CoBo update (Faisal)
Tuesday, July 24, 2012
- Agenda
- Micromegas pad pattern with fine pitch area (Saul)
- 8Be statistics update (Aimee)
- Tiled micromegas data taking and mapping (Remi, Malek, Tan)
- GET electronics testing (Wolfi, Tan)
- CoBo testing/ZAP update (Faisal)
Tuesday, July 17, 2012
- Agenda
- More data taken for tiled resitive micromegas (Malek, Remi, Tan)
- Gas tube progress (Ian)
- Prototype CoBo boards received (Faisal)
Tuesday, July 10, 2012
- Agenda
- Tiled micromegas measurements (Malek, Remi, Tan)
- 10Be angle measurements (Adam)
- CoBo and ZAP update (Faisal)
Tuesday, July 3, 2012
- Agenda
- Considerations for ZAP/AsAd mounting, shielding, cooling
- GET electronics testing started (Tan, Faisal)
- Micromegas pad design considerations (Saul)
- Allene test results (Malek, Remi)
Tuesday, June 26, 2012
- Agenda
- Endplate design details (Daniel)
- 10Be + 6He analysis (Adam)
- Gas handling parts ordered (Zach)
- Plan for gas tubes for Prototype (Ian)
- GET software installation and testing plans (Tan, Daniel)
- Pad simulation update (Saul)
Tuesday, June 19, 2012
- Agenda
- Allene measurements (Malek, Remi)
- 8,9Be analysis (Aimee)
- MCP housing modifications (Adam)
- CoBo update (Faisal)
Tuesday, June 12, 2012
- Agenda
- Pad geometry simulation (Saul)
- GET software update (Nathan)
- CoBo and ZAP update (Faisal)
Tuesday, June 5, 2012
- Agenda
- Allene testing (Malek, Remi, Tan)
- Micromegas pad simulation results (Saul)
- Be analysis (Aimee)
- ZAP design (Faisal)
Tuesday, May 29, 2012
- Agenda
- End plate developments (Daniel)
- Gas mixture (Ar-H2) measurements (Malek, Remi, Tan)
- Be fusion analysis (Aimee)
- ZAP design (Faisal)
Tuesday, May 22, 2012
- Agenda
- End plate prototype (Daniel)
- Physics discussion meetings to start
Thursday, May 10, 2012
- Agenda
- Solenoid enclosure and magnetic field considerations (Daniel)
- ZAP design considerations (Daniel)
- GET raw data unpacking (Tan)
- CoBo quotes (Faisal)
- Agiltron micromegas testing (Saul, Wolfi)
Thursday, May 3, 2012
- Agenda
- ATTPC final design almost ready. HV was ordered this morning. (Daniel)
- Gas handling system (Zach)
- Test with micromegas from Agiltron (Wolfi)
- Conditioning of micromegas, simulation progress (Saul)
- Board designed about to be submitted (Faisal)
- 9Be and 8Be (Aimee)
- Repairing MCP housing, root code (Adam)
Thursday, April 25, 2012
- Agenda
- GET software fully compiled in MAC (Nathan is fixing some bugs) (Daniel)
- Gas handling system (Zach/John)
- Shielding of the solenoid (Wolfi)
- Conditioning of micromegas (Saul)
- SBIR will send commercial micromegas to test (Wolfi)
- 9Be and 8Be (Aimee)
- Repairing MCP housing (Adam)
Thursday, April 19, 2012
- Agenda
- Power supply quote (Daniel)
- Conditioning of micromegas (Tan and Saul)
- Mapping on the way while waiting for the connectors to arrive (Daniel and Ian)
- Mechanical design almost ready. Working in a transportation cart for the detector (Daniel)
- 9Be and 8Be (Aimee)
- Simulation in progress (Saul)
- Dineutron FRESCO simulation (Adam)
Thursday, April 12, 2012
- Agenda
- AGET, AsAd update and plans for testing (Nathan)
- Proposal for fission studies with Prototype (Bill)
Thursday, April 5, 2012
- Agenda
- AsAd pinout (Nathan)
- Plans for conditioning micromegas and test electronics
- Discussion on programmable ZAP
- Magnet yoke, fringe field calculations underway (Daniel)
- Search for 8Be (Aimee)
Thursday, March 29, 2012
- Agenda
- Power supply quotes (Daniel)
- Search for 9Be (Aimee)
- Discussion on amplifiers and linear circuits
- Gas handling system update (Zach)
- COBO update (Faisal)
Thursday, March 23, 2012
- Agenda
- AT-TPC flange design (Daniel)
- AGET testing and COBO progress (Nathan, Faisal)
- Micromegas pad design considerations (Saul)
Thursday, March 1, 2012
- Agenda
- Solenoid field calculations (Daniel)
- ND experiment Prep
- AGET testing update (Nathan)
Thursday, February 23, 2012
- Agenda
- Samurai TPC pad plane (Jon Barney)
- AT-TPC flange design (Daniel)
- Allene test results (Tan)
- 6He data analysis (Aimee)
- ND experiment trigger (Wolfi)
Thursday, February 16, 2012
- Agenda
- Prep for ND experiment
- Ar + H2 tests (Tan, Saul)
- COBO DDR update (Faisal)
Wednesday, February 8, 2012
- Agenda
- Prep Issues for ND experiment, adapter piece for MCP/Prototype (Adam, Tan)
- COBO update (Faisal)
- Gas Handling update (Zach)
Thursday, February 3, 2012
- Agenda
- Update from Bob Flight on AT-TPC design (Daniel)
- Adaptor Board status (Tan, Ian)
- AGET testing update (Nathan)
- Gas Handling update, discussion of need for recirculation and gas chromatagraph (Zach, John)
Thursday, January 26, 2012
- Agenda
- NIM signal to T2K test (Tan)
- Resistive Micromegas Adapter board (Ian)
- COBO, crate setup (Faisal)
- Gas handling system update (Zach)
Thursday, January 19, 2012
- Agenda
- Ar + H2 mixture test results (Wolfi, Tan, Ian)
- Notre Dame experiment scheduling and needs
- AGET testing to be planned (Nathan)
- COBO update, issues with DDR memory (Faisal)
- Gas handling system requirements (John)
- ND date analysis (Adam, Aimee)
Thursday, January 12, 2012
- Agenda
- Test of resistive micromegas, Adapter board (Tan, Ian)
- Plan for Ar+H test (Wolfi, Tan, Ian)
- some thoughts about ND experiment trigger
- Gas handling system update (Zach)
- Micromegas pad design
Thursday, January 5, 2012
- Agenda
- AT-TPC Design update, chamber shortened (Daniel)
- Resistive Micromegas Adapter board (Ian)
- AGET testing (Nathan)
- COBO update (Faisal)
- Allene info (Tan)
Thursday, December 22, 2011
- Agenda
- AT-TPC Design update
- COBO, change from 3 to 1 data format (Nathan)
Thursday, December 15, 2011
- Agenda
- Resistive Micromegas, possibilities for capacitance measurement
- Plan to test different gas mixtures (Ar+H, allene), (Ian)
- Design of resistive Micromegas adapter board (Ian)
Thursday, December 8, 2011
- Agenda
- Resistive Micromegas Simulations (Wolfi)
- GET meeting: GET board presented (Faisal)
- need to test logic in chip
- hit pattern recognition possible?
Thursday, November 3, 2011
- Agenda
- ND experiment in October (DS)
- GET (Nathan)
Thursday, September 15, 2011
- Agenda
- CoBo (Nathan)
- ND experiment in October (DS)
- MCP (Adam/Wes)
Thursday, September 08, 2011
- Agenda
- ND experiment in October (DS)
- Design effort/ Gas handling (Daniel)
- ND visit & MCP (Adam/Wes)
- GET (Nathan)
- Testing of Micromegas with pulser(Wolfi)
Thursday, September 01, 2011
- Agenda
- Test chamber with ZAP/ ND experiment in October (DS)
- PCB for MCP (Adam/Wes)
- CoBo (Nathan)
Thursday, August 25, 2011
Thursday, August 11, 2011
- Agenda
- Test chamber with ZAP (DS)
- CoBo (Nathan)
- Analysis of ND fusion data (Aimee)
- Gas handling system (John)
Thursday, August 4, 2011
- Agenda
- Analysis of ND data (DS)
- CoBo (Nathan)
- Analysis of ND fusion data (Aimee)
Thursday, July 28, 2011
- Agenda
- Range analysis for hydrogen (Fred)
- Correlation between pads of Micromegas (Fabien)
- New AsAd board (Nathan)
- MCP (Adam)
- Resistive Micromegas (Wolfi)
Thursday, July 21, 2011
- Agenda
- ReA3 layout (Fernando)
- Delay line (Adam/Aimee)
- Resistive Micromegas (Wolfi)
- Range analysis for hydrogen (Fred)
- Correlation between pads of Micromegas (Fabien)
- Gas handling system (John)
- Spring connector (Bill)
- ZAP/Micromegas for Prototype (Wes)
Thursday, July 14, 2011
- Agenda
- ReA3 layout (Fernando)
- Samurai TPC (Rebecca)
- CoBo (Nathan/Faisal)
- Gas handling system (John)
- Correlation between pads of Micromegas (Fabien/Fred)
Thursday, July 7, 2011
- Agenda
- CoBo (Nathan/Faisal)
- Narval (Eugene)
- Delay line for the MCP (Adam/Aimee)
- Analysis of the hydrogen data / Pad response (Fabien/Fred)
Thursday, June 30, 2011
- Agenda
- Test of hydrogen (Dany)
- Analysis of the hydrogen data (Fabien)
- Simulation of the pad responses (Fred)
- Narval (Eugene/Fred)
- CoBo (Nathan/Faisal/Gilles)
- Delay line for the MCP (Adam)
- Resistive Micromegas (Aimee)
Thursday, June 23, 2011
- Agenda
- CoBo/AsAd (Nathan)
- uTCA (Faisal)
- ND analysis (DS)
- Hydrogen test (Dany)
- Charge division (Aimee)
- Analysis of H2 data (Fred/Fabien)
Thursday, June 16, 2011
- Agenda
- ND beam monitor / ND analysis (DS)
- Hydrogen test (Dany)
- Reaction calculation (Adam)
- CoBo status (Nathan)
- Design of the AT-TPC (Daniel)
Thursday, June 9, 2011
- Agenda
- ND beam development (DS)
- P10 test (Eugene)
- MCP (Adam, Aimee)
- CoBo status (Nathan)
Thursday, June 2, 2011
- Agenda
- Test of hydrogen/P10 (Dany)
- He+Isobutane/ ND beam development (DS)
- MCP (Adam, Aimee)
- CoBo status (Faisal)
Thursday, May 26, 2011
- Agenda
- Preparation for ND fall/ He+Isobutane (DS)
- MCP (Adam, Aimee)
- AsAd status (Nathan)
- CoBo status (Faisal)
Thursday, May 19, 2011
- Agenda
- Test of hydrogen gas (Eugene, Dany)
- Analysis of the Notre Dame data (DS)
- MCP (Adam, Aimee)
- AsAd status (Nathan)
- CoBo status (Faisal)
- Gas handling system test (John)
Thursday, May 12, 2011
- Agenda
- Analysis of the Notre Dame data (DS)
- Test of hydrogen gas (Eugene, Dany)
- Resistive Micromegas (Wolfi)
- MCP (Adam, Aimee)
- AsAd status (Nathan)
Thursday, May 5, 2011
Thursday, April 28, 2011
- Agenda
- Commissioning at Notre Dame(DS)
Thursday, March 17, 2011
- Agenda
- Schedule of transport(DS)
- Upgraded T2K (Eugene)
- Reduced CObo (Nathan)
- MCP(Adam)
Thursday, March 10, 2011
- Agenda
- Visit to ND (DS)
- Upgraded T2K (Eugene)
- Stay at Saclay (Nathan)
- MCP(Adam)
Thursday, March 3, 2011
- Agenda
- Analysis of the wire plane (Lu)
- Prototype AT-TPC (DS)
- Upgraded T2K (Eugene)
- GET (Faisal)
- Power Supply (Daniel)
Thursday, February 24, 2011
- Agenda
- Prototype AT-TPC: Uniformity, time dependence (DS)
- Power supply for GET (Eugene)
- MCP & beam window foil (Adam)
- Visit to Saclay (Nathan)
- Gas handling system (John)
Thursday, February 17, 2011
- Agenda
- ZAP (Mike)
- Trigger (Wolfi)
- MCP (Adam)
- Matsusada Power Supply (Daniel)
Thursday, February 10, 2011
- Agenda
- The beam line ladder (Mike)
- Gas handler (John)
- The Prototype AT-TPC (DS)
- Reduced Cobo (Nathan)
- Upgraded T2K and its support(Eugene)
- Cross talk of the PCB (Bill)
- Preliminary Project Plan (Daniel)
Thursday, February 3, 2011
- Agenda
- The Prototype AT-TPC (DS)
- Upgraded T2K, grounding of the GET (Eugene)
- micro TCA (Faisal, Nathan)
- Gas handler (John)
Thursday, January 27, 2011
- Agenda
- Designing of the AT-TPC (Marius)
- The Prototype AT-TPC (DS)
- Upgraded T2K, grounding of the GET (Eugene)
Friday, January 14, 2011
- Agenda
- The Prototype AT-TPC (DS)
- Designing of the AT-TPC (Marius)
- Designing of the ZAP (Mike)
- Status of the Prototype GET (Nathan)
Thursday, January 6, 2011
- Agenda
- The DAQ, the new T2K (Eugene)
- The Prototype AT-TPC (DS)
- Designing of the AT-TPC (Marius)
- Development of the gas handler (John)
- Micro TCA (Faisal)
- Status of the Prototype GET (Nathan)
Thursday, December 30, 2010
Thursday, December 16, 2010
- Agenda
- Update of the Prototype AT-TPC (DS/Eugene)
- Commissioning at ND (DS)
- New T2K (Eugene)
- Status of the stay of Nathan in Bordeaux (Daniel/Faisal)
Thursday, December 9, 2010
- Agenda
- Update of the Prototype AT-TPC (DS)
- DAQ system for the GET (Eugene)
- Reduced CoBo update (Faisal)
Thursday, December 2, 2010
- Agenda
- Update of the Prototype AT-TPC (DS)
- Reduced CoBo update (Nathan)
Thursday, November 18, 2010
- Agenda
- Update of the Prototype AT-TPC (DS)
- Design of the AT-TPC (Marius)
- Reduced CoBo update (Nathan)
Thursday, November 11, 2010
- Agenda
- Commissioning at ND (DS)
- Reduced CoBo update (Nathan)
Thursday, November 4, 2010
- Agenda
- Update of testing of the Prototype AT-TPC (DS)
- Reduced CoBo update (Nathan)
- Design of the Field Cage (Jon)
Thursday, October 28, 2010
- Agenda
- The cathode power supply issue (DS)
- Conditioning of the Micromegas (Mike)
- Reduced CoBo update (Nathan)
- Testing of the CO2 trap (John/Mike)
- Design of the Field Cage (Jon)
Thursday, October 21, 2010
- Agenda
- Testing of the CO2 trap (Mike)
- The control software of power supplies (Eugene)
- Assembly of the Prototype AT-TPC (DS/Mike)
Friday, October 15, 2010
- Agenda
- Report on the visit of CEA-Saclay (Nathan/Eugene)
Thursday, October 7, 2010
- Agenda
- Assembly of the Prototype AT-TPC (DS)
Thursday, September 30, 2010
- Agenda
- Micromegas fabrication at Saclay (Mike/Bill)
- Progress on assembly of prototype detector (Daisuke)
Thursday, September 23, 2010
- Agenda
- Cable & remote control of high voltage power supply (Eugene)
- Status of fabrication of Micromegas (Daisuke)
- Status of hydrogen/deuterium safety (Daisuke)
- Status of assembly of Prototype AT-TPC (John/Jon/Daisuke)
- Status of testing of the CO2 trap (John)
- Reduced CoBo/Prototype GET plan (Nathan)
Thursday, September 16, 2010
Thursday, September 9, 2010
Thursday, September 2, 2010
Thursday, August 26, 2010
- Agenda
- Progress on prototype fabrication and assembly (Mike)
- Cathode voltage feedthru for the AT-TPC (Eugene)
- Progress on wire plane tests (Daisuke)
Thursday, August 12, 2010
Thursday, August 5, 2010
- Agenda
- GET status (Nathan)
- Laser calibration system (Justin/Mike)
- Gas handling system for the Prototype (DS)
Thursday, July 29, 2010
- Agenda
- Design of the AT-TPC (Harry)
- The status of the analysis of the Micromegas test (Anthony)
Thursday, July 22, 2010
- Agenda
- Review of the gas handling system of the AT-TPC (John/Ana)
- GET power supply / Remote control system (Eugene)
Thursday, July 15, 2010
- Agenda
- Status of testing of Micromegas (Anthony/Claire)
- Status of MCP design (Justin)
- Misc. information (DS)
Thursday, July 8, 2010
- Agenda
- Status of the design of the Prototype (Daisuke)
- Status of the new test room (Bill)
- Multi-pin connector connection test kit with LED (Mike)
- Laser & X-Y table (Mike/Justin)
- Misc (Hydrogen gas, Gas handling system review, Power supply)
Thursday, July 1, 2010
Thursday, June 24, 2010
- Agenda
- review released drawing for the prototype from B. Flight, before sending to J. Ottarson for final design review (Daisuke)
- progress on testing of gas mixtures and energy resolution (Claire)
- suggestions for organization of test area (Bill)
- Announcements (Daniel)
Thursday, June 17, 2010
- Agenda
- Update of the design of the AT-TPC (Harry)
- Status of the test of Micromegas (Claire/Justin/Anthony) Slides
Thursday, June 10, 2010
- Agenda
- Update of the design of the Prototype AT-TPC (DS)
Thursday, June 3, 2010
- Agenda
- Status of move to new testing area and test setup (Daisuke) Slides
- Discussion of milestone dates for prototype (Daisuke/Daniel)
- Status of CoBo development (and other DAQ components?) (Nathan)
Thursday, May 27, 2010
- Agenda
- New test area organization and progress (Daisuke)
- Tests of micromegas - resolution with alpha source (Claire) Slides
- Preparation of issues to discuss with Bob Flight at next meeting this coming Friday
- Breakdown of AT-TPC project in sub-projects (Daniel)
Thursday, May 20, 2010
- Agenda
- New test room update
- Testing of Micromegas; reduction of negative cross talk Slides
- ANSYS for studying mechanical characteristics of the AT-TPC
- Design of Prototype AT-TPC at Rochester
Thursday, May 13, 2010
- Agenda
- Testing of micromegas in test chamber Slides
- Status of clean room and its infrastructure
- Status of connector board prototype
- Prototype design at Rochester / organization of follow-up weekly meetings
- Possibility of collaboration with Lawrence Livermore National Laboratory
Thursday, May 6, 2010
- Agenda
Thursday, April 29, 2010
- Agenda
- Status of clean room (Daisuke) Slides
- Test of micromegas with new connectors (Mike/Daisuke)
- Concept drawing for TPC angle mechanism (Harry)
Thursday, April 22, 2010
- Agenda
- Design of prototype in Rochester (Daisuke)
- Gas handling system design (Fernando/Ana)
- Clean room construction (Daniel/Daisuke)
- Connector assembly prototype (Mike)
- Discussion about items that should be procured ASAP (Bill)
- Miscellaneous
Thursday, April 15, 2010
Thursday, April 8, 2010
- Agenda
- The status of the CoBo (NU) Slides
- The individual bias circuit and the insertion test kit of the Micromegas (MF)
Thursday, April 1, 2010
- Agenda
Thursday, March 25, 2010
- Agenda
- Capacitance measurement of Micromegas (MF) Slides
- Status of the Prototype design (WM/DS)
Thursday, March 18, 2010
- Agenda
- Electric field simulation (FM) Simulation result
- Filed cage design (DS) Slides
- ZAP design (WL) ZAP circuit design ZAP integration
- Micromegas capacitance (WM)
- Purchasing of a scroll pump (FM/DS)