e14009 to-do list:
Test dE PA box
Zero degree detector
Build mount (UCONN)(1/11/17)
Build detector/Lead (WU) (1/9/17)
Modify copper mouth piece (WU)
Disassemble HiRA Array (Kyle/Pierre/Sean S 1/4)
Reassemble Array (Pierre/Sean S 1/6-1/7)
Install dE PA box (Sean/Juan 1/6)
Test dE's?
Install mount for zero degree detector (1/11 -1/14)
Retest Si E and CsI electronics with pulsers/cosmics (1/16)
Alter trigger logic (Trigger will be either EF and EB or EF and EB and Zero Degree)
Possible Travel days
Alan 1/11-1/18, 2/3
Sean/Dan 1/9-1/13
Other items - added 1/17
Implement dE bias for all detectors, test and calibrate dEs
Install 0deg detector, internal cabling
Setup QDC, test - modify readout and other code to accommodate
Install Cu beam blocks - test all
Install targets
Install beam-pipe section