• skip to content

AT-TPC Wiki

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
Trace: • actar_collaboration_meeting_bordeaux_june_16_-_18 • organizational_meeting_4_22_2009 • cobo_meeting_september_25_2008 • actar_collaboration_meeting_bordeaux_june_16_-_18_2008

actar_collaboration_meeting_bordeaux_june_16_-_18_2008

Table of Contents

  • ACTAR WORKSHOP BORDEAUX
  • Introduction
  • The physics programs
  • Instrumentation overview
  • Electro-mechanics for TPCs
  • AFTER+
  • System architecture
  • Acquisition software

Official link to workshop agenda. Access key = actar_bx

ACTAR WORKSHOP BORDEAUX

ACTAR_Workshop_Program
Minutes of the workshop

Introduction

Introduction

The physics programs

CENBG TPC
ACTAR GANIL
Physics TPC at R3B
Physics AT-TPC MSU
Active target for R3B at FAIR

Instrumentation overview

Instrumentation at R3B
Active target measurements at MSU
Measurements on multiparticules events

Electro-mechanics for TPCs

Protection of the frontend electronics
Large bulk Micromegas for the T2K/TPC

AFTER+

Functionnality and possibles applications
Positions, charges and time measurements with AFTER+

System architecture

Possible solution to fit in the acquisition hardware
Possible solution to fit in the MSU requirements
DAQ ANTARES, a possible model

Acquisition software

Evolution of ADQ software at GANIL, solutions adopted for slow & run control

actar_collaboration_meeting_bordeaux_june_16_-_18_2008.txt · Last modified: 2008/09/16 06:27 by 127.0.0.1

Page Tools

  • Show pagesource
  • Old revisions
  • Backlinks
  • Back to top
Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Noncommercial-Share Alike 4.0 International
CC Attribution-Noncommercial-Share Alike 4.0 International Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki