Line 1: Line 1:
-List of tasks after the experiments with HiRA (e10001,e11001,e10011)+List of tasks to do after the experiments with HiRA (e10001,e11001,e10011)
  
-  - Packing of HiRA stuff 
-    * Decide where to store CAEN HV power supply and chiller (talk to Chasity) 
-    * pack all the equipment that is only used in experiments in s2 vault together 
-    * pack the cables and equipment that is used in any HiRA experiment separately 
-  - Electronics 
-    * Return epool electronics used in the experiment 
-    * Return epool electronics that is in the HiRA cabinet  
   - Before packing HiRA equipment   - Before packing HiRA equipment
     * HiRA preamps     * HiRA preamps
Line 13: Line 6:
         * fix the labeling convention (front label has to match the back label)         * fix the labeling convention (front label has to match the back label)
     * bias cables - verify that they have all working channels and fix if necessary     * bias cables - verify that they have all working channels and fix if necessary
-        * 2 red cables (bias for HiRA E and CsI; cable going from the CAEN PS to Sparky + extension)+        * 2 red cables (bias for HiRA E and CsI; cable going from the CAEN PS to Sparky + extension cable)
         * gray cables (bias for HiRA dE)         * gray cables (bias for HiRA dE)
     * verify the problem with readout when pulsing 14 PAs at the same time     * verify the problem with readout when pulsing 14 PAs at the same time
 +    * have a complete inventory of HiRA Si detectors including the number of bad strips and decide where to fix them (John Yurkon vs Micron)
 +  - Packing of HiRA stuff
 +    * Decide where to store CAEN HV power supply and chiller
 +    * pack all the equipment that is only used in experiments in s2 vault together
 +    * pack the cables and equipment that is used in any HiRA experiment separately
 +    * Take pictures, move items to storage or lab space
 +    * Dismantle and pack PA setup
 +  - Electronics
 +    * Return epool electronics used in the experiment
 +    * Return epool electronics that is in the HiRA cabinet 
 +    * Remove electronics racks and move to HiRA lab
 +  - Inside chamber
 +    * Remove detectors
 +    * Pack up cables, mount, TC boxes, etc.
 +    * Buy new camera 
 +    * Remove chamber (Dave Sanderson)
  
 + 