This is an old revision of the document!
List of tasks after the experiments with HiRA (e10001,e11001,e10011)
Packing of HiRA stuff
Decide where to store CAEN HV power supply and chiller (talk to Chasity)
pack all the equipment that is only used in experiments in s2 vault together
pack the cables and equipment that is used in any HiRA experiment separately
Electronics
Before packing HiRA equipment