List of tasks after the experiments with HiRA (e10001,e11001,e10011)

  1. Packing of HiRA stuff
    • Decide where to store CAEN HV power supply and chiller (talk to Chasity)
    • pack all the equipment that is only used in experiments in s2 vault together
    • pack the cables and equipment that is used in any HiRA experiment separately
  2. Electronics
    • Return epool electronics used in the experiment
    • Return epool electronics that is in the HiRA cabinet
  3. Before packing HiRA equipment
    • HiRA preamps
      • make sure that all 20 PA MBs are working
      • fix the labeling convention (front label has to match the back label)
    • bias cables - verify that they have all working channels and fix if necessary
      • 2 red cables (bias for HiRA E and CsI; cable going from the CAEN PS to Sparky + extension)
      • gray cables (bias for HiRA dE)
    • verify the problem with readout when pulsing 14 PAs at the same time