Line 3: Line 3:
 prior to vault access: prior to vault access:
   - Test HINP 4 electronics (10/3)   - Test HINP 4 electronics (10/3)
-    * Edit spectcl for HINP 4 (Kyle, 10/3) +    * Test HINP 4 (E) motherboard and HINP 3 (dE) together (Kyle, 10/31)
-    * Pulser test MB1 (14 CBs) (Kyle, 10/10) +
-    * Test HINP 4 (E) motherboard and HINP 3 (dE) together (Kyle)+
   - Test CsI shaper/disc (Sean/Kuan)   - Test CsI shaper/disc (Sean/Kuan)
-    * Test 5 pico shaper/disc (16 channels each)  +    * Test 5 pico shaper/disc (16 channels each)   
-    * Confirm with WU/UCONN if first stage shaper gains need adjustment +  - Test dE preamp box (e14009, UCONN)
-  - Alpha Tests of HiRA E's (Kyle/Sean, 10/12) +
-    * Determine if/which strips are broken +
-  - Test dE preamp box (e14009)+
     * Determine if/which channels are broken     * Determine if/which channels are broken
     * Work with WU to integrate ISEG bias     * Work with WU to integrate ISEG bias
-  - Set up HiRA mount (in N2/N3) with dummy detectors (Sean,Kuan) 
-    * locate missing pieces 
-  - Test/locate all internal cables with cable tester, remake/fix any lost or broken cables 
  
 After access to vault (Nov 1) After access to vault (Nov 1)
   - Test HiRA target ladder   - Test HiRA target ladder
     * Work with Craig Snow to modify if needed      * Work with Craig Snow to modify if needed 
-  - Work with facilities to get chamber installed (Finished by Nov 12) 
   - Clean chamber and reach functional vacuum (1e-6)   - Clean chamber and reach functional vacuum (1e-6)
-  - Arrange feed-through flanges as desired and retest vacuum (Nov 12) 
   - Install internal mounting structure (Nov 14)   - Install internal mounting structure (Nov 14)
     * Maintain isolation of internal parts from the chamber walls, test frequently     * Maintain isolation of internal parts from the chamber walls, test frequently
Line 31: Line 21:
     * We can test these are leak tight by first pumping with them empty (water blown out with Nitrogen) and then fill with water and retest vacuum. No HiRA detectors inside chamber until this is complete!     * We can test these are leak tight by first pumping with them empty (water blown out with Nitrogen) and then fill with water and retest vacuum. No HiRA detectors inside chamber until this is complete!
     * Once they have been leak tested these should never be disconnected.     * Once they have been leak tested these should never be disconnected.
-  - locate computer and desk for vault 
-  - Move electronics racks (3, from hira lab) to S2 vault . Connect to chamber feed-through flanges 
-    * Retest electrical isolation. The racks must be unplugged from power. 
   - Test electronics with pulsers   - Test electronics with pulsers
   - Remove dummies and replace with real telescopes. Align with transit.   - Remove dummies and replace with real telescopes. Align with transit.