Line 2: | Line 2: | ||
prior to vault access: | prior to vault access: | ||
- | | + | - Test HINP 4 electronics (10/3) |
- | | + | * Test HINP 4 (E) motherboard and HINP 3 (dE) together (Kyle, 10/31) |
- | * Integrate HINP4 readout code with NSCL DAQ (Kyle) | + | - Test CsI shaper/ |
- | * Edit spectcl for HINP 4 | + | * Test 5 pico shaper/disc (16 channels each) |
- | * Pulser test MB1 (14 CBs) | + | - Test dE preamp box (e14009, UCONN) |
- | - Test CsI shaper/ | + | |
- | * Test 5 pico shaper/disc (16 channels each) | + | |
- | * Confirm with WU/UCONN if first stage shaper gains need adjustment | + | |
- | - Alpha Tests of HiRA E's | + | |
- | * Determine if/which strips are broken | + | |
- | - Test dE preamp box (e14009) | + | |
* Determine if/which channels are broken | * Determine if/which channels are broken | ||
* Work with WU to integrate ISEG bias | * Work with WU to integrate ISEG bias | ||
- | - Retrieve pallets from offsite storage | ||
- | - Set up HiRA mount (outside of chamber) with dummies | ||
- | * locate missing pieces | ||
- | * Determine which parts need updated for e14009 zero degree detector | ||
- | - Test HiRA target ladder | ||
- | * Work with Craig Snow to modify | ||
- | - Test/locate all internal cables with cable tester, remake/fix any lost or broken cables | ||
After access to vault (Nov 1) | After access to vault (Nov 1) | ||
- | - Work with facilities | + | - Test HiRA target ladder |
+ | * Work with Craig Snow to modify if needed | ||
- Clean chamber and reach functional vacuum (1e-6) | - Clean chamber and reach functional vacuum (1e-6) | ||
- | | + | - Install internal mounting structure |
- | | + | * Maintain isolation of internal parts from the chamber walls, test frequently |
- | * Maintain isolation of internal parts from the chamber walls, test frequentl | + | |
- Assemble the array with HiRA dummies and do rough alignment with transit | - Assemble the array with HiRA dummies and do rough alignment with transit | ||
* Dave Sanderson will need to install the transit | * Dave Sanderson will need to install the transit | ||
- | - Flush and install chiller, replace filter as needed | + | - Install chiller |
- | - Install | + | * We can test these are leak tight by first pumping with them empty (water blown out with Nitrogen) and then fill with water and retest vacuum. No HiRA detectors inside chamber until this is complete! |
- | * We can test these are leak tight by first pumping with them empty (water blown out with N2) and then fill with water and retest vacuum. No HiRA detectors inside chamber until this is complete! | + | |
* Once they have been leak tested these should never be disconnected. | * Once they have been leak tested these should never be disconnected. | ||
- | - Move electronics racks to S2 vault. Connect to chamber feed-through flanges | ||
- | * Retest electrical isolation. The racks must be unplugged from power. | ||
- Test electronics with pulsers | - Test electronics with pulsers | ||
- Remove dummies and replace with real telescopes. Align with transit. | - Remove dummies and replace with real telescopes. Align with transit. |