User Tools

Site Tools


e24joe

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
e24joe [2024/11/08 11:02]
dopfer
e24joe [2025/05/20 09:55] (current)
dopfer
Line 1: Line 1:
-**XIA DDAS steps** with spdaq55:+{{:2025-05-19.pptx| Results of Pad Gainmatching}}\\ 
 +{{:dopfer_guidance_committee_2025_frib.pdf |}}\\ 
 +{{ :dopfer_2024-12-06.pptx |}} 
 + 
 +**XIA DDAS steps** with spdaq55:\\ 
 +{{https://docs.frib.msu.edu/daq/newsite/| Link to DDAS Docs}}\\ 
 +{{https://docs.frib.msu.edu/daq/newsite/ddas-12.1-001/index.html| Link to DAQ Docs}}\\
  
 1) Run Readout 1) Run Readout
Line 84: Line 90:
 {{:merger_info_runs_351-407.rtf}}\\ {{:merger_info_runs_351-407.rtf}}\\
 {{:merger_info_runs_408-483.rtf}}\\ {{:merger_info_runs_408-483.rtf}}\\
 +{{:merger_info_runs_484-567.rtf}}\\
  
 Config File we are currently using to process h5 files:\\ Config File we are currently using to process h5 files:\\
Line 95: Line 102:
 {{:describe-cobo2.xcfg.rtf}}\\ {{:describe-cobo2.xcfg.rtf}}\\
 {{:describe-cobo3.xcfg.rtf}}\\ {{:describe-cobo3.xcfg.rtf}}\\
 +
 +GET Config for e24joe vs config for 800 torr operation:
 +{{:configure-2cobos-800torr.xcfg.rtf}}\\
 +{{:configure-2cobos-e24joe.xcfg.rtf}}\\
  
 Transferring processed runs from Mac to fistank with the following command: Transferring processed runs from Mac to fistank with the following command:
Line 717: Line 728:
 | 0559 | 6 | 19.0 | 0140 | began 11-08-2024 10:04; 152Eu calibration run w/ no gas flow. 152Eu on top of TPC near AsAd box (source rim against the TPC edge, source center 2.7 cm from the rim) for Ge calibration. Two lead bricks were added to block 228Th gammas for this, which were not present in the previous calibration runs.| | 0559 | 6 | 19.0 | 0140 | began 11-08-2024 10:04; 152Eu calibration run w/ no gas flow. 152Eu on top of TPC near AsAd box (source rim against the TPC edge, source center 2.7 cm from the rim) for Ge calibration. Two lead bricks were added to block 228Th gammas for this, which were not present in the previous calibration runs.|
 | 0560 | 6 |  | 0140 | began 11-08-2024 10:35; 152Eu calibration run w/ no gas flow. 152Eu on top of TPC near center (source center 13 cm from the TPC edge) for Ge calibration. Two lead bricks were added to block 228Th gammas for this, which were not present in the previous calibration runs.| | 0560 | 6 |  | 0140 | began 11-08-2024 10:35; 152Eu calibration run w/ no gas flow. 152Eu on top of TPC near center (source center 13 cm from the TPC edge) for Ge calibration. Two lead bricks were added to block 228Th gammas for this, which were not present in the previous calibration runs.|
 +| 0561 | 6 | 19.7 | 0140 | began 11-08-2024 11:07; 152Eu on top of TPC near cathode (source center 40 cm from the TPC edge) for Ge calibration. Two lead bricks were added to block 228Th gammas for this, which were not present in the previous calibration runs.| 
 +| 0562 | 6 | 19.6 | 0140 | began 11-08-2024 11:38; 152Eu on South side of TPC (source center 20 cm from the TPC edge) for Ge calibration. Two lead bricks were added to block 228Th gammas for this, which were not present in the previous calibration runs.| 
 +| 0563 | 6 | 19.2 | 0140 | began 11-08-2024 12:10; 152Eu on North side of TPC (source center 5.5 cm from the TPC edge) for Ge calibration. Two lead bricks were added to block 228Th gammas for this, which were not present in the previous calibration runs.| 
 +| 0564 | 6 | 19.7 | 0140 | began 11-08-2024 12:42; bg run w/ no gas flow, 152Eu source in source locker in 1039 (same room)| 
 +| 0565 | 6 | 20.1 | 0140 | began 11-08-2024 16:38; bg run w/ no gas flow, 152Eu source in source locker in 1039 (same room)| 
 +| 0566 | 6 | 20.1 | 0140 | began 11-09-2024 10:15; bg run w/ no gas flow, 152Eu source in source locker in 1039 (same room)| 
 +| 0567 | 5 | 19.8 | 0140 | began 11-10-2024 11:44; bg run w/ no gas flow, 152Eu source in source locker in 1039 (same room)|
  
 |0801: 152Eu on top of TPC near AsAd box (source rim against the TPC edge, source center 2.7 cm from the rim) for Ge calibration. End Run at 1823 seconds into the run. Run Title: 228Th_152Eu_onTop_nearAsadBox_Mesh_Ch0_MeshAccepted_Ch1_North_Ch3_South_Ch5. The first 2 minutes were noisy; superseded by run 0806.||||| |0801: 152Eu on top of TPC near AsAd box (source rim against the TPC edge, source center 2.7 cm from the rim) for Ge calibration. End Run at 1823 seconds into the run. Run Title: 228Th_152Eu_onTop_nearAsadBox_Mesh_Ch0_MeshAccepted_Ch1_North_Ch3_South_Ch5. The first 2 minutes were noisy; superseded by run 0806.|||||
e24joe.1731081737.txt.gz · Last modified: 2024/11/08 11:02 by dopfer