List of tasks to do after the experiments with HiRA (e10001,e11001,e10011)

- Before packing HiRA equipment

  • HiRA preamps
    • make sure that all 20 PA MBs are working
    • fix the labeling convention (front label has to match the back label)
  • bias cables - verify that they have all working channels and fix if necessary
    • 2 red cables (bias for HiRA E and CsI; cable going from the CAEN PS to Sparky + extension)
    • gray cables (bias for HiRA dE)
  • verify the problem with readout when pulsing 14 PAs at the same time
  • have a complete inventory of HiRA Si detectors including the number of bad strips and decide where to fix them (John Yurkon vs Micron)
  1. Packing of HiRA stuff
  • Decide where to store CAEN HV power supply and chiller (talk to Chasity)
  • pack all the equipment that is only used in experiments in s2 vault together
  • pack the cables and equipment that is used in any HiRA experiment separately
  1. Electronics
  • Return epool electronics used in the experiment
  • Return epool electronics that is in the HiRA cabinet