This is an old revision of the document!
List of tasks after the experiments with HiRA (e10001,e11001,e10011)
Packing of HiRA stuff
Decide where to store CAEN HV power supply and chiller (talk to Chasity)
Electronics
Return epool electronics used in the experiment
Return epool electronics that is in the HiRA cabinet