msu:list_of_task_after_the_experiments [2013/08/26 13:52]
manfredi
msu:list_of_task_after_the_experiments [2013/09/19 12:48] (current)
manfredi
Line 11: Line 11:
     * have a complete inventory of HiRA Si detectors including the number of bad strips and decide where to fix them (John Yurkon vs Micron)     * have a complete inventory of HiRA Si detectors including the number of bad strips and decide where to fix them (John Yurkon vs Micron)
   - Packing of HiRA stuff   - Packing of HiRA stuff
-    * Decide where to store CAEN HV power supply and chiller (talk to Chasity)+    * Decide where to store CAEN HV power supply and chiller
     * pack all the equipment that is only used in experiments in s2 vault together     * pack all the equipment that is only used in experiments in s2 vault together
     * pack the cables and equipment that is used in any HiRA experiment separately     * pack the cables and equipment that is used in any HiRA experiment separately
 +    * Take pictures, move items to storage or lab space
 +    * Dismantle and pack PA setup
   - Electronics   - Electronics
     * Return epool electronics used in the experiment     * Return epool electronics used in the experiment
     * Return epool electronics that is in the HiRA cabinet      * Return epool electronics that is in the HiRA cabinet 
 +    * Remove electronics racks and move to HiRA lab
   - Inside chamber   - Inside chamber
     * Remove detectors     * Remove detectors
     * Pack up cables, mount, TC boxes, etc.     * Pack up cables, mount, TC boxes, etc.
     * Buy new camera      * Buy new camera 
 +    * Remove chamber (Dave Sanderson)
 +
    