Line 11: Line 11:
     * have a complete inventory of HiRA Si detectors including the number of bad strips and decide where to fix them (John Yurkon vs Micron)     * have a complete inventory of HiRA Si detectors including the number of bad strips and decide where to fix them (John Yurkon vs Micron)
   - Packing of HiRA stuff   - Packing of HiRA stuff
-    * Decide where to store CAEN HV power supply and chiller (talk to Chasity)+    * Decide where to store CAEN HV power supply and chiller
     * pack all the equipment that is only used in experiments in s2 vault together     * pack all the equipment that is only used in experiments in s2 vault together
     * pack the cables and equipment that is used in any HiRA experiment separately     * pack the cables and equipment that is used in any HiRA experiment separately
 +    * Take pictures, move items to storage or lab space
 +    * Dismantle and pack PA setup
   - Electronics   - Electronics
     * Return epool electronics used in the experiment     * Return epool electronics used in the experiment
     * Return epool electronics that is in the HiRA cabinet      * Return epool electronics that is in the HiRA cabinet 
 +    * Remove electronics racks and move to HiRA lab
 +  - Inside chamber
 +    * Remove detectors
 +    * Pack up cables, mount, TC boxes, etc.
 +    * Buy new camera 
 +    * Remove chamber (Dave Sanderson)
 +
    