This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
msu:list_of_task_after_the_experiments [2013/08/21 10:50] chajecki |
msu:list_of_task_after_the_experiments [2013/09/19 12:48] (current) manfredi |
||
---|---|---|---|
Line 1: | Line 1: | ||
List of tasks to do after the experiments with HiRA (e10001, | List of tasks to do after the experiments with HiRA (e10001, | ||
- | - Packing of HiRA stuff | ||
- | * Decide where to store CAEN HV power supply and chiller (talk to Chasity) | ||
- | * pack all the equipment that is only used in experiments in s2 vault together | ||
- | * pack the cables and equipment that is used in any HiRA experiment separately | ||
- | - Electronics | ||
- | * Return epool electronics used in the experiment | ||
- | * Return epool electronics that is in the HiRA cabinet | ||
- Before packing HiRA equipment | - Before packing HiRA equipment | ||
* HiRA preamps | * HiRA preamps | ||
Line 13: | Line 6: | ||
* fix the labeling convention (front label has to match the back label) | * fix the labeling convention (front label has to match the back label) | ||
* bias cables - verify that they have all working channels and fix if necessary | * bias cables - verify that they have all working channels and fix if necessary | ||
- | * 2 red cables (bias for HiRA E and CsI; cable going from the CAEN PS to Sparky + extension) | + | * 2 red cables (bias for HiRA E and CsI; cable going from the CAEN PS to Sparky + extension |
* gray cables (bias for HiRA dE) | * gray cables (bias for HiRA dE) | ||
* verify the problem with readout when pulsing 14 PAs at the same time | * verify the problem with readout when pulsing 14 PAs at the same time | ||
+ | * have a complete inventory of HiRA Si detectors including the number of bad strips and decide where to fix them (John Yurkon vs Micron) | ||
+ | - Packing of HiRA stuff | ||
+ | * Decide where to store CAEN HV power supply and chiller | ||
+ | * pack all the equipment that is only used in experiments in s2 vault together | ||
+ | * pack the cables and equipment that is used in any HiRA experiment separately | ||
+ | * Take pictures, move items to storage or lab space | ||
+ | * Dismantle and pack PA setup | ||
+ | - Electronics | ||
+ | * Return epool electronics used in the experiment | ||
+ | * Return epool electronics that is in the HiRA cabinet | ||
+ | * Remove electronics racks and move to HiRA lab | ||
+ | - Inside chamber | ||
+ | * Remove detectors | ||
+ | * Pack up cables, mount, TC boxes, etc. | ||
+ | * Buy new camera | ||
+ | * Remove chamber (Dave Sanderson) | ||
+ |