- | List of tasks after the experiments with HiRA (e10001, | + | List of tasks to do after the experiments with HiRA (e10001, |
+ | - Before packing HiRA equipment | ||
+ | * HiRA preamps | ||
+ | * make sure that all 20 PA MBs are working | ||
+ | * fix the labeling convention (front label has to match the back label) | ||
+ | * bias cables - verify that they have all working channels and fix if necessary | ||
+ | * 2 red cables (bias for HiRA E and CsI; cable going from the CAEN PS to Sparky + extension cable) | ||
+ | * gray cables (bias for HiRA dE) | ||
+ | * verify the problem with readout when pulsing 14 PAs at the same time | ||
+ | * have a complete inventory of HiRA Si detectors including the number of bad strips and decide where to fix them (John Yurkon vs Micron) | ||
- Packing of HiRA stuff | - Packing of HiRA stuff | ||
- | | + | |
+ | * pack all the equipment that is only used in experiments in s2 vault together | ||
+ | * pack the cables and equipment that is used in any HiRA experiment separately | ||
+ | * Take pictures, move items to storage or lab space | ||
+ | * Dismantle and pack PA setup | ||
- Electronics | - Electronics | ||
- | | + | |
- | | + | |
- | - | + | * Remove electronics racks and move to HiRA lab |
+ | - Inside chamber | ||
+ | * Remove detectors | ||
+ | * Pack up cables, mount, TC boxes, etc. | ||
+ | * Buy new camera | ||
+ | * Remove chamber (Dave Sanderson) | ||
+ |