| e14009 to-do list: | e14009 to-do list: | ||
| - | Before e14002 | ||
| - Test dE PA box | - Test dE PA box | ||
| - | | + | * How will the biases get from ISEG to PA tower -> 4 cables made by WU (1/9/17) |
| - | | + | |
| - Zero degree detector | - Zero degree detector | ||
| - | * Need to design and build (WU and UCONN) | + | * Build mount (UCONN)(1/11/17) |
| - | * Modify existing HiRA mount to hold detector (Craig Snow + WU/UConn) | + | * Build detector/Lead (WU) (1/9/17) |
| - | - Find and test dE cables from e10011 | + | * Modify copper mouth piece (WU) |
| + | - Disassemble HiRA Array (Kyle/ | ||
| + | * Install 14 dE detectors (Kyle/ | ||
| + | - Reassemble Array (Pierre/ | ||
| + | - Install dE PA box (Sean/Juan 1/6) | ||
| - Test dE's? | - Test dE's? | ||
| - | * Is there a good/safe way to test these detectors without having | + | * Add HINP3 to DAQ (Kyle 1/7-1/8) |
| - | - May replace | + | * Test HINP3 MB with pulsers (Kyle 1/7-1/8) |
| - | * Design/modify mounting structure to support these detectors | + | * Test bias distribution with new cables (1/9) |
| - | * Does Alan have separate calibration beams? | + | * Hunt noise |
| - | * Test HiRA upgrade | + | - Install mount for zero degree detector (1/11 -1/14) |
| + | - Retest Si E and CsI electronics with pulsers/ | ||
| + | - Alter trigger logic (Trigger will be either EF and EB or EF and EB and Zero Degree) | ||
| - | After 14002 | + | Possible Travel days |
| - | - Remove HiRA telescopes and install dE detectors | + | |
| - | | + | * Sean/Dan 1/9-1/13 |
| - | - Install dE PA box | + | |
| - | - Remount HiRA telescopes and zero degree detector | + | |
| - | - Set up dE bias --> ISEG | + | |
| - | - Test dE with alpha source | + | |
| - | * Reduce noise | + | |
| - | | + | |
| - | - Alter trigger logic | + | |
| + | Other items - added 1/17 | ||
| + | Implement dE bias for all detectors, test and calibrate dEs | ||
| + | Install 0deg detector, internal cabling | ||
| + | Setup QDC, test - modify readout and other code to accommodate | ||
| + | Install Cu beam blocks - test all | ||
| + | Install targets | ||
| + | Install beam-pipe section | ||