This is an old revision of the document!
Ordered list of tasks for e14002:
prior to vault access:
Set up HiRA lab test setup (9/6)
Test HINP 4 electronics (9/6)
Integrate HINP4 readout code with NSCL DAQ (Kyle, 9/6)
Edit spectcl for HINP 4 (Kyle, 9/12)
Pulser test MB1 (14 CBs)
Test CsI shaper/disc
Alpha Tests of HiRA E's
Test dE preamp box (e14009)
Retrieve pallets from offsite storage
Set up HiRA mount (outside of chamber) with dummies
Test HiRA target ladder
Test/locate all internal cables with cable tester, remake/fix any lost or broken cables
After access to vault (Nov 1)
Work with facilities to get chamber installed
Clean chamber and reach functional vacuum (1e-6)
Arrange feed-through flanges as desired and retest vacuum (Nov 12)
Install internal mounting structure (Nov 13)
Assemble the array with HiRA dummies and do rough alignment with transit
Flush and install chiller, replace filter as needed
Install cooling water lines inside chamber.
We can test these are leak tight by first pumping with them empty (water blown out with N2) and then fill with water and retest vacuum. No HiRA detectors inside chamber until this is complete!
Once they have been leak tested these should never be disconnected.
Move electronics racks to S2 vault. Connect to chamber feed-through flanges
Test electronics with pulsers
Remove dummies and replace with real telescopes. Align with transit.
Setup and test ISEG bias supply
test the Si detectors with alpha source
test CsI with cosmics
Install and align targets
Set up the logic.