Experiment #06035 Evolution of Neutron Holes in N=28 Closed Shell
Improvement List for Next Time
MCP
mount design: need to standardize the design for both MCP mounts. Design an Al housing around the MCP detectors.
Screws should be the right size to install with non-magnetic allen wrenches. Also, screws should be of consistent size
Switch amplifiers (green)
Design better ground: either include in PC board or provide an additional ground plane.
update MCP database
Target mechanisms
Need target ladder in G10 frame shape with non-magnetic heli-coils
Need better alignment to the target drive (dowel pin?)
use screws that fit to non-magnetic allen wrenches
redesign drive, deal with wearing out of brass gear, etc.
MCP0 drive needs to take into account the 3mm offset
HiRA
Need a jig to do quick test of Si detectors
Redesign the CsI gold cables
Redesign the cable stress release mounts, stand-off on the inspect channel splitter/attenuators
Redesign CsI pulser box to allow access to switch and cabling
Does the CsI board to what we need?
order new chipboards plus spares
consider have DE chipboards inside chamber (need power cables)
Need more space from detectors to motherboards?
Need to build faraday cage in each tower so that cable connections aer not disturbed
Fix individual telescopes broken parts, dowel pins, and get spare parts
Fix shorting power cables
Electronics
Need more reshapers and 16 channel NIM discriminators
Check MCP QDC channels
Need new or fixed scalers
Proceedures
Partial bias tests of MCPs and Sis at air before pumping
document setup and test proceedures
run TDC as common start
Software
Modify Spectcl so that it is remotely usable for trivial things