Minutes January 27, 2012
Present
Mike, Rachel, Suwat, Zibi, Jack, Bec, Betty, Bill
Dan–very late! Maybe moving group meeting to accommodate new schedule.
Group Business
HiRA boxes: Jimmy is working on cleaning the parts, should finish next week. Then he'll re-make one and show Bill and Betty
Si E's were ordered for the new telescopes, have enough CsI crystals
Lab moving: repair 124 by mid-February and moving crane over. Do we need a crane in 127? After we move in, maybe
Discussion on N111, 127 plans
N111: miniball display: Shop suggested they have extra I-beams, we could make a table. Bill suggests a table on wheels.
127: Need to remeasure the test chamber, TPC, door to make sure we have enough room
Computer Committee Update
Updates
Dan: Statistics for PV vs. NW within cuts. Meaningful data for single-hit, now moving to multi-hit
Zibi: Transverse flow paper for BUU calculations. Will look at energy dependence on efficiency next week
Bec: TPC: detector designs, WMU has laser system designed. For Tilak's exp: talking with Jeff Tostevin to fix up TWOFNR
Jack: time-stamped files merged for 07038. A few won't merge (<1%) but looking into it.
Rachel: t/3He energy spectra, broken up by CsI. Need efficiency.
Mike: merger file working, now with new variables total multiplicity, Ecm, missing cuts for H and He
Suwat: voltage step-down should be back from shop soon