This is an old revision of the document!
Table of Contents
Detectors
June 5, 2013
The 90 degree configuration.
From Hole 29
From Hole 28
From Hole 25
The entire sphere
April 6, 2013
The liquid hydrogen target has been installed. (Left: the target cell, Right: the system is installed on the chamber.)
April 5, 2013
April 3, 2013
Reconfigured for the liquid hydrogen target: All the seven quads are mounted on the northern (Berkeley-western) hemisphere.
10.5 mm
105 mm
April 1, 2013
On the final day of the first configuration (these pictures were taken immediately before we started the reconfiguration).