This is an old revision of the document!
Table of Contents
Detectors
April 6, 2013
The liquid hydrogen target has been installed. (Left: the target cell, Right: the system is installed on the chamber.)
April 5, 2013
April 3, 2013
Reconfigured for the liquid hydrogen target: All the seven quads are mounted on the northern (Berkeley-western) hemisphere.
10.5 mm
105 mm
April 1, 2013
On the final day of the first configuration (these pictures were taken immediately before we started the reconfiguration).