This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
e21010 [2023/06/23 22:23] sunli |
e21010 [2024/05/22 23:44] (current) sunli |
||
|---|---|---|---|
| Line 12: | Line 12: | ||
| June 20, 2023, installed 239Pu-241Am-244Cm triple alpha source for Pads calibration. Moved Ge's into position (6 mm from the chamber).\\ | June 20, 2023, installed 239Pu-241Am-244Cm triple alpha source for Pads calibration. Moved Ge's into position (6 mm from the chamber).\\ | ||
| June 21, 2023, Pads and DSSDs calibration with 239Pu-241Am-244Cm. Shapers troubleshooting.\\ | June 21, 2023, Pads and DSSDs calibration with 239Pu-241Am-244Cm. Shapers troubleshooting.\\ | ||
| - | June 22, 2023, HPGe energy calibration with 152Eu. 133Cs beam 500 pA in Faraday cup. | + | June 22, 2023, HPGe energy calibration with 152Eu. 133Cs beam 500 pA in Faraday cup.\\ |
| + | June 23-25, 2023, set up Grafana and Data-U3. 25Al and 26Si beam tuning.\\ | ||
| + | June 26-30, 22Al 5 pps; 21Mg 300 pps; 25Si 300 pps; 26P 50 pps + 25Si 40 pps + 24Al 200 pps\\ | ||
| FRIB PAC1 Proposal\\ | FRIB PAC1 Proposal\\ | ||
| Line 19: | Line 21: | ||
| === Ge detectors specifications === | === Ge detectors specifications === | ||
| North Ge:{{ : | North Ge:{{ : | ||
| + | |||
| South Ge:{{ : | South Ge:{{ : | ||
| X-ray Ge: | X-ray Ge: | ||
| - | CP5 Plus Control Panel Application: | + | E21010 Temperature Records:{{ : |
| + | |||
| + | CP5 Plus Control Panel Application: | ||
| iPA Control Panel Application: | iPA Control Panel Application: | ||
| Line 75: | Line 80: | ||
| From Sean Liddick:\\ | From Sean Liddick:\\ | ||
| 8 ribbon cables. | 8 ribbon cables. | ||
| + | |||
| + | |||
| + | Analysis:\\ | ||
| + | {{ : | ||
| + | {{ : | ||
| + | {{ :: | ||
| + | {{ :: | ||
| + | {{ :: | ||
| + | |||
| + | |||
| + | Simulated Ge efficiency.{{ :: | ||
| + | |||
| + | |||
| + | https:// | ||
| + | https:// | ||
| + | {{ :: | ||