User Tools

Site Tools


msu:ordered_to_do_list

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
msu:ordered_to_do_list [2016/09/01 11:03]
brownk created
msu:ordered_to_do_list [2016/09/01 11:13] (current)
brownk
Line 1: Line 1:
-Ordered list of tasks for e14002+Ordered list of tasks for e14002:
  
 +prior to vault access:
 +  - Set up HiRA lab test setup
   - Test HINP 4 electronics   - Test HINP 4 electronics
-    * Integrate HINP4 readout code with NSCL DAQ (Kyle, 9/5)+    * Integrate HINP4 readout code with NSCL DAQ (Kyle)
     * Edit spectcl for HINP 4     * Edit spectcl for HINP 4
     * Pulser test MB1 (14 CBs)      * Pulser test MB1 (14 CBs) 
   - Test CsI shaper/disc   - Test CsI shaper/disc
-    * Unordered List Item +    * Test 5 pico shaper/disc (16 channels each)  
-  - +    * Confirm with WU/UCONN if first stage shaper gains need adjustment 
 +  - Alpha Tests of HiRA E's 
 +    * Determine if/which strips are broken 
 +  - Test dE preamp box (e14009) 
 +    * Determine if/which channels are broken 
 +    * Work with WU to integrate ISEG bias 
 +  - Retrieve pallets from offsite storage 
 +  - Set up HiRA mount (outside of chamber) with dummies 
 +    * locate missing pieces 
 +  - Test HiRA target ladder 
 +    * Work with Craig Snow to modify  
 +  - Test/locate all internal cables with cable tester, remake/fix any lost or broken cables
msu/ordered_to_do_list.1472742215.txt.gz · Last modified: 2016/09/01 11:03 by brownk