- | Ordered list of tasks for e14002 | + | Ordered list of tasks for e14002: |
+ | prior to vault access: | ||
+ | - Set up HiRA lab test setup | ||
- Test HINP 4 electronics | - Test HINP 4 electronics | ||
- | * Integrate HINP4 readout code with NSCL DAQ (Kyle, 9/5) | + | * Integrate HINP4 readout code with NSCL DAQ (Kyle) |
* Edit spectcl for HINP 4 | * Edit spectcl for HINP 4 | ||
* Pulser test MB1 (14 CBs) | * Pulser test MB1 (14 CBs) | ||
- Test CsI shaper/disc | - Test CsI shaper/disc | ||
- | * Unordered List Item | + | * Test 5 pico shaper/disc (16 channels each) |
- | - | + | * Confirm with WU/UCONN if first stage shaper gains need adjustment |
+ | - Alpha Tests of HiRA E's | ||
+ | * Determine if/which strips are broken | ||
+ | - Test dE preamp box (e14009) | ||
+ | * Determine if/which channels are broken | ||
+ | * Work with WU to integrate ISEG bias | ||
+ | - Retrieve pallets from offsite storage | ||
+ | - Set up HiRA mount (outside of chamber) with dummies | ||
+ | * locate missing pieces | ||
+ | - Test HiRA target ladder | ||
+ | * Work with Craig Snow to modify | ||
+ | - Test/locate all internal cables with cable tester, remake/fix any lost or broken cables |