msu:ordered_to_do_list [2016/09/01 11:03] brownk created |
msu:ordered_to_do_list [2016/09/01 11:13] (current) brownk |
||
|---|---|---|---|
| Line 1: | Line 1: | ||
| - | Ordered list of tasks for e14002 | + | Ordered list of tasks for e14002: |
| + | prior to vault access: | ||
| + | - Set up HiRA lab test setup | ||
| - Test HINP 4 electronics | - Test HINP 4 electronics | ||
| - | * Integrate HINP4 readout code with NSCL DAQ (Kyle, 9/5) | + | * Integrate HINP4 readout code with NSCL DAQ (Kyle) |
| * Edit spectcl for HINP 4 | * Edit spectcl for HINP 4 | ||
| * Pulser test MB1 (14 CBs) | * Pulser test MB1 (14 CBs) | ||
| - Test CsI shaper/disc | - Test CsI shaper/disc | ||
| - | * Unordered List Item | + | * Test 5 pico shaper/disc (16 channels each) |
| - | - | + | * Confirm with WU/UCONN if first stage shaper gains need adjustment |
| + | - Alpha Tests of HiRA E's | ||
| + | * Determine if/which strips are broken | ||
| + | - Test dE preamp box (e14009) | ||
| + | * Determine if/which channels are broken | ||
| + | * Work with WU to integrate ISEG bias | ||
| + | - Retrieve pallets from offsite storage | ||
| + | - Set up HiRA mount (outside of chamber) with dummies | ||
| + | * locate missing pieces | ||
| + | - Test HiRA target ladder | ||
| + | * Work with Craig Snow to modify | ||
| + | - Test/locate all internal cables with cable tester, remake/fix any lost or broken cables | ||