14002: Before vault:

-Get pallets from storage (where do we put them?)

-Organize schedule with facilities to install chamber, TMP

-Organize, assemble, test electronics (e.g. what kind of XLMs will we use?)

-Remove dEs

-Test Es and decide on telescope arrangement

-Plan out flange mapping

-Will there be any detectors running at 2 gains like last time?

-Procure an alpha source (does the lab have a new one yet?)

In vault:

-Alignment (Dave Sanderson)

-Install electronics, test

-Clean chamber and get good vacuum

-Flush and install chiller

-Set up HV crate with proper bias mapping (with WU boxes probably)

-Install telescope mount

-Install telescopes, cable, hook up cooling carefully

-Test setup with alpha source

-Setup targets

-Align

14009: Before 14002:

-Think about modifications for dE setup

-Test dE PA box (confirm how many PAs we have that work)

After 14002:

-Remove telescopes, install dEs

-Install dEs (maybe test them first, before removing them for 14002?)

-Will we use a HiRA telescope at 0 deg? If so, we need a mount. If not, we need the detectors as well as a mount and proper electronics. Do we need to worry about radiation damage?

-Install mount at 0 deg, associated electronics, and dE electronics/PA box

-Install HiRA telescopes

-Set up DE bias in HV crate

-Test with alpha source