User Tools

Site Tools


msu:experiments_with_hira_in_2013

This is an old revision of the document!


Experiments in HiRA in 2013

There are 3 experiments with HiRA that will be run in 2013:

  • 10001 - Bob Charity - 129h (in Feb)
  • 11001 - Lee Sobotka - 77h (in May)
  • 10011 - Alan Wuosmaa - 161 h (unscheduled, most likely in Fall 2013)

Tasks:

  1. Resurrect HiRA test setup (Huan, Jake, Zbigniew)
    • mechanical work and cabling is basically finished
    • vacuum test done
    • what is left:
    • test the electronics with the scope
    • test the old readout
  2. Development of the NSCL DAQ software for upcoming experiments with HiRA - work order: RC100609.11720.W01576 (Ron Fox)
    • previous task has to be finished first
  3. Upgrade the HiRA readout to ringbuffer (Huan, Zbigniew)
    • previous 2 tasks have to be finished first
  4. New 2-gain boards (Jake, Bill, Zbigniew)
  5. New CsI cables (Jake, Bill, Zbigniew, Mike)
  6. Assemble 3 new HiRA telescopes (Mike?, Rachel?)
    • need drawings of the board
    • need part numbers
  1. Modification of the drawings of HiRA PA box for an upcoming experiment - work order: RC100609.11720.W01613
msu/experiments_with_hira_in_2013.1351094429.txt.gz · Last modified: 2012/10/24 12:00 by chajecki