User Tools

Site Tools


msu:experiments_with_hira_in_2013

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
msu:experiments_with_hira_in_2013 [2012/10/24 12:20]
chajecki
msu:experiments_with_hira_in_2013 [2013/05/05 18:17] (current)
chajecki
Line 5: Line 5:
  
 There are 3 experiments with HiRA that will be run in 2013: There are 3 experiments with HiRA that will be run in 2013:
-  - 10001 - Bob Charity - 129h (in Feb)  +  - [[:experiments/e10001|10001 - Bob Charity - 129h (in Feb) ]] 
-  - 11001 - Lee Sobotka - 77h (in May) +  - [[:experiments/e11001|11001 - Lee Sobotka - 77h  May, 23-26]] 
-  - 10011 - Alan Wuosmaa - 161 h (unscheduledmost likely in Fall 2013)+  - [[:experiments/e10011|10011 - Alan Wuosmaa - 161 h (approx July4]]
  
-==== Tasks: ==== 
-  - Resurrect HiRA test setup (Huan, Jake, Zbigniew) 
-    * mechanical work and cabling is basically finished 
-    * vacuum test done 
-    * what is left: 
-      * test the electronics with the scope 
-      *  test the old readout 
-  - Development of the NSCL DAQ software for upcoming experiments with HiRA  - work order: RC100609.11720.W01576 (Ron Fox) 
-    * previous task has to be finished first 
-  - Upgrade the HiRA readout to ringbuffer (Huan, Zbigniew) 
-    * previous 2 tasks have to be finished first 
-  - New 2-gain boards (Jake, Bill, Zbigniew) 
-  - New CsI cables (Jake, Bill, Zbigniew, Mike) 
-  - Assemble 3 new HiRA telescopes (Rachel?, Jack?, Mike?) 
-    * need drawings of the board 
-    * need part numbers  
-    * how many CsI crystals do we have? 
  
----- +  
- +  
-==== Tasks related to Alan's experiment ONLY ==== + 
-  - Modification of the drawings of HiRA PA box for an upcoming experiment - work order: RC100609.11720.W01613 +
msu/experiments_with_hira_in_2013.1351095644.txt.gz · Last modified: 2012/10/24 12:20 by chajecki