This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
msu:experiments_with_hira_in_2013 [2012/10/24 11:59] chajecki |
msu:experiments_with_hira_in_2013 [2013/05/05 18:17] (current) chajecki |
||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== Experiments in HiRA in 2013 ====== | ====== Experiments in HiRA in 2013 ====== | ||
| + | |||
| + | ---- | ||
| There are 3 experiments with HiRA that will be run in 2013: | There are 3 experiments with HiRA that will be run in 2013: | ||
| - | | + | |
| - | | + | |
| - | | + | |
| - | ==== Tasks: ==== | ||
| - | - Resurrect HiRA test setup (Huan, Jake, Zbigniew) | ||
| - | * mechanical work and cabling is basically finished | ||
| - | * vacuum test done | ||
| - | * what is left: | ||
| - | * test the electronics with the scope | ||
| - | * test the old readout | ||
| - | - Development of the NSCL DAQ software for upcoming experiments with HiRA - work order: RC100609.11720.W01576 (Ron Fox) | ||
| - | * previous task has to be finished first | ||
| - | - Upgrade the HiRA readout to ringbuffer (Huan, Zbigniew) | ||
| - | * previous 2 tasks have to be finished first | ||
| - | - New 2-gain boards (Jake, Bill, Zbigniew) | ||
| - | - New CsI cables (Jake, Bill, Zbigniew, Mike) | ||
| - | - Assemble 3 new HiRA telescopes | ||
| - | * need drawings of the board | ||
| - | * need part numbers | ||
| - | ==== Tasks related to Alan's experiment ONLY ==== | + | |
| - | - Modification of the drawings of HiRA PA box for an upcoming experiment - work order: RC100609.11720.W01613 | + | |
| + | |||