This is an old revision of the document!
e10011 Experiment:
===== To do list: ===== (as of 6/16)
X Modify the PA box parts (Western)
X Assemble PA box and test preamps (Western + NSCL)
New CsI cables (NSCL) - Craig Snow working on drawings
X Mount dEs on HiRA telescopes (NSCL, WashU)
X Set up 4th motherboard (NSCL)
X Move HiRA telescopes downstream in s2 chamber (e08001 configuration) (NSCL, Western)
X Cable HiRA (including dE's - it may require making few new cables; some of the old cables can be reused) (NSCL, Western) - during site visit
X Test all 4 MBs and PA box with a pulser (NSCL)
Alpha calibration for dEs (NSCL) - bad dE currently being replaced by Zibi and Lee
Software (expand daq software and spectcl to read dEs) (NSCL) - new histograms need to be made for online analysis
X Trigger (changes required to read and trigger on dEs) (NSCL, WashU)
Multiplexer
Scalers
cable_connector.pdf