This is an old revision of the document!
e10011 Experiment:
===== To do list: ===== (as of 6/16)
X Modify the PA box parts (Western)
Assemble PA box and test preamps (Western + NSCL)
New CsI cables (NSCL)
X Mount dEs on HiRA telescopes (NSCL, WashU)
X Set up 4th motherboard (NSCL)
X Move HiRA telescopes downstream in s2 chamber (e08001 configuration) (NSCL, Western)
Cable HiRA (including dE's - it may require making few new cables; some of the old cables can be reused) (NSCL, Western)
Test all 4 MBs and PA box with a pulser (NSCL)
Alpha calibration for dEs (NSCL)
Software (expand daq software and spectcl to read dEs) (NSCL)
Trigger (changes required to read and trigger on dEs) (NSCL, WashU)
cable_connector.pdf