e10011 Experiment:
To do list:
Modify the PA box parts (Western)
Assemble PA box and test preamps
New CsI cables
Mount dEs on HiRA telescopes
Set up 4th motherboard
Move HiRA telescopes downstream in s2 chamber (e08001 configuration)
Hook up HiRA (including dE's - it may require making few new cables; some of the old cables can be reused)
Test all 4 MBs and PA box with a pulser
Alpha calibration for dEs
Software (expand daq software and spectcl to read dEs)
Trigger (changes required to read and trigger on dEs)