User Tools

Site Tools


experiments_e10011

This is an old revision of the document!


e10011 Experiment:

To do list:

  1. Modify the PA box parts (Western)
  2. Assemble PA box and test preamps
  3. New CsI cables
  4. Mount dEs on HiRA telescopes
  5. Set up 4th motherboard
  6. Move HiRA telescopes downstream in s2 chamber (e08001 configuration)
  7. Hook up HiRA (including dE's - it may require making few new cables; some of the old cables can be reused)
  8. Test all 4 MBs and PA box with a pulser
  9. Alpha calibration for dEs
  10. Software (expand daq software and spectcl to read dEs)
  11. Trigger (changes required to read and trigger on dEs)
experiments_e10011.1367792848.txt.gz · Last modified: 2013/05/05 18:27 by chajecki