This shows you the differences between two versions of the page.
| Both sides previous revision Previous revision Next revision | Previous revision | ||
|
experiments_e10011 [2013/05/06 13:29] chajecki |
experiments_e10011 [2013/07/01 14:00] (current) manfredi |
||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== e10011 Experiment: | ====== e10011 Experiment: | ||
| | | ||
| - | ===== To do list: ===== | + | ===== To do list: ===== (as of 6/16) |
| - | - Modify the PA box parts (Western) | + | - X Modify the PA box parts (Western) |
| - | - Assemble PA box and test preamps (Western + NSCL) | + | - X Assemble PA box and test preamps (Western + NSCL) |
| - | - New CsI cables (NSCL) | + | - New CsI cables (NSCL) |
| - | - Mount dEs on HiRA telescopes (NSCL, WashU) | + | - X Mount dEs on HiRA telescopes (NSCL, WashU) |
| - | - Set up 4th motherboard (NSCL) | + | - X Set up 4th motherboard (NSCL) |
| - | - Move HiRA telescopes downstream in s2 chamber (e08001 configuration) (NSCL, Western) | + | - X Move HiRA telescopes downstream in s2 chamber (e08001 configuration) (NSCL, Western) |
| - | - Cable HiRA (including dE's - it may require making few new cables; some of the old cables can be reused) (NSCL, Western) | + | - X Cable HiRA (including dE's - it may require making few new cables; some of the old cables can be reused) (NSCL, Western) |
| - | - Test all 4 MBs and PA box with a pulser (NSCL) | + | - X Test all 4 MBs and PA box with a pulser (NSCL) |
| - | - Alpha calibration for dEs (NSCL) | + | - Alpha calibration for dEs (NSCL) |
| - | - Software (expand daq software and spectcl to read dEs) (NSCL) | + | - Software (expand daq software and spectcl to read dEs) (NSCL) |
| - | - Trigger (changes required to read and trigger on dEs) (NSCL, WashU) | + | - X Trigger (changes required to read and trigger on dEs) (NSCL, WashU) |
| + | - Multiplexer | ||
| + | - Scalers (add in dEs) | ||
| + | - Beam blocker (installation) | ||
| {{: | {{: | ||