This is an old revision of the document!
CsI Water Damage Repair:
Remove CsI crystals (56 out of 56) (11/15)
Dismantle telescopes
Store E, dE detectors
Unwrap CsI bundles
Remove as much filter paper as possible from CsI (using ethanol and plastic scraper) (56 out of 56) (11/20)
Document damage (depth on front surface) (56 out of 56)
Detach photodiodes from each crystal (leave light guides on for now) (56 out of 56) (12/19)
Remove remaining filter paper and light guide paint (56 out of 56) (12/19)
Sand sides of each crystal (0 out of 56)
Ship crystals to WashU (2 out of 56) (12/12)
Design and assemble lapping setup (design completed) (1/1)
Motion control + support
Coarse vertical motion
CsI holder that attaches to motion control
Sandpaper (delivered) (11/18)
Craig is busy, but will try to look at it within the next month
Practice lapping with beam blocker (?)