This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
detectors:csi_repair [2014/04/15 15:20] manfredi |
detectors:csi_repair [2014/04/29 14:55] (current) manfredi |
||
---|---|---|---|
Line 13: | Line 13: | ||
- Sand sides of each crystal **(56 out of 56)** (3/14) | - Sand sides of each crystal **(56 out of 56)** (3/14) | ||
- Design and assemble lapping setup (4/14) | - Design and assemble lapping setup (4/14) | ||
- | | + | |
- | | + | |
- | | + | |
* Sandpaper (delivered) (11/18) | * Sandpaper (delivered) (11/18) | ||
+ | * Order stoppers (04/25) | ||
+ | * Spacer (04/28) | ||
- Clean photodiodes, | - Clean photodiodes, | ||
- Reglue uncoupled light guides | - Reglue uncoupled light guides | ||
+ | - more RTV615 needed | ||
- Practice lapping with worst crystals (4/21) | - Practice lapping with worst crystals (4/21) | ||
+ | - First practice with plastic crystal (04/29) | ||
- Lap crystals until surface clean (4/28) | - Lap crystals until surface clean (4/28) | ||
- Polish, rewrap, assemble bundles (5/14) | - Polish, rewrap, assemble bundles (5/14) | ||
- Test individual crystals in dark box (check leakage current) | - Test individual crystals in dark box (check leakage current) | ||
- Reassemble telescopes (??) | - Reassemble telescopes (??) |