This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
detectors:csi_repair [2013/12/12 14:24] manfredi |
detectors:csi_repair [2014/04/29 14:55] (current) manfredi |
||
---|---|---|---|
Line 7: | Line 7: | ||
- Remove as much filter paper as possible from CsI (using ethanol and plastic scraper) **(56 out of 56)** (11/20) | - Remove as much filter paper as possible from CsI (using ethanol and plastic scraper) **(56 out of 56)** (11/20) | ||
- Document damage (depth on front surface) **(56 out of 56)** | - Document damage (depth on front surface) **(56 out of 56)** | ||
- | - Detach photodiodes from each crystal (leave light guides on for now) **(56 out of 56)** (12/27) | + | - Detach photodiodes from each crystal (leave light guides on for now) **(56 out of 56)** (12/19) |
- | - Remove remaining filter paper and light guide paint **(20 out of 56)** (12/12) | + | - Remove remaining filter paper and light guide paint **(56 out of 56)** (12/19) |
- | - Sand sides of each crystal | + | - MAchine crystals at WashU **(56 out of 56)** (1/18) |
- | - Ship crystals to WashU **(2 out of 56)** (12/12) | + | * Driven down/back |
- | - Design and assemble lapping setup **(work order approved)** (1/1) | + | - Sand sides of each crystal |
- | | + | - Design and assemble lapping setup (4/14) |
- | | + | |
- | | + | |
+ | | ||
* Sandpaper (delivered) (11/18) | * Sandpaper (delivered) (11/18) | ||
- | | + | * Order stoppers (04/25) |
+ | * Spacer (04/28) | ||
+ | - Clean photodiodes, | ||
+ | - Reglue uncoupled light guides | ||
+ | - more RTV615 needed | ||
+ | | ||
+ | - First practice with plastic crystal (04/29) | ||
+ | - Lap crystals until surface clean (4/28) | ||
+ | - Polish, rewrap, assemble bundles (5/14) | ||
+ | - Test individual crystals in dark box (check leakage current) | ||
+ | - Reassemble telescopes |