Some pictures taken just before starting dismounting. The beam pipes have been already disconnected.
The 90 degree configuration.
The liquid hydrogen target has been installed. (Left: the target cell, Right: the system is installed on the chamber.)
Reconfigured for the liquid hydrogen target: All the seven quads are mounted on the northern (Berkeley-western) hemisphere.
On the final day of the first configuration (these pictures were taken immediately before we started the reconfiguration).