Turning On/Off SCM

This page lists the the procedures for the group turn on/off of SCM on the FTC network as well as for the EXP netowrk. These can only be performed by operators with the “Be an FRIB Superconducting Magnets Operator” competency in Enterprise.

FTC

The group on/off page for the FTC network magnets can be found by going to 'FRIB Launch' → 'SCM Main opi' → 'SCM Turn ON'. Each tab on the SCM Turn ON page corresponds to the related section on this wiki page.

LINAC Solenoids

Turn On:

Turn Off:

FS2 Dipoles

Turn On:

Turn Off:

Target Hall SCM

VPS Magnets

Turn On

Turn Off

ARIS Magnets

EXP