| ====== Turning On/Off SCM ====== | ====== Turning On/Off SCM ====== | ||
| - | This page lists the the procedures for the group turn on/off of SCM for FRIB. These can only be performed by operators with the "Be an FRIB Superconducting Magnets Operator" | + | This page lists the the procedures for the group turn on/off of SCM on the FTC network as well as for the EXP netowrk. These can only be performed by operators with the "Be an FRIB Superconducting Magnets Operator" |
| ===== FTC ===== | ===== FTC ===== | ||
| - | The group on/off page for the FTC magnets can be found by going to 'FRIB Launch' | + | The group on/off page for the FTC network |
| - | ==== LINAC Solenoids | + | ==== LINAC Solenoids ==== |
| + | **Turn On:** | ||
| + | * Click the lead flow on button for the desired linac segment | ||
| + | * Wait for all lead flow LEDs to turn green | ||
| + | * Click the solenoids on button for the desired segment after confirming that all lead flows are on | ||
| + | * Check that all solenoids and correctors have ramped to their proper setpoints | ||
| + | **Turn Off:** | ||
| + | * Click the solenoids off button for the desired linac segment | ||
| + | * Wait for all power supplies in the segment to turn off (power supply LEDs should no longer be green) | ||
| + | * Click the lead flow off button for the desired segment | ||
| + | * Check that all lead flow LEDs for the segment are no longer green | ||
| ==== FS2 Dipoles ==== | ==== FS2 Dipoles ==== | ||
| + | **Turn On:** | ||
| + | * Click the two 'LD Valve ON' buttons for the dipoles | ||
| + | * Once both of the lead flow power supply LEDs are green and the LFV state message box reads 'LFV ON' for a dipole, click the ' | ||
| + | * Check that the dipole power supply has ramped to the correct setpoint after the dipole state message box reads ' | ||
| + | **Turn Off:** | ||
| + | * Click the 'FS2 SCD# OFF' button for the desired dipole | ||
| + | * Confirm that the power supply and lead flow LEDs are no longer green after the ramp down | ||
| ==== Target Hall SCM ==== | ==== Target Hall SCM ==== | ||
| ==== VPS Magnets ==== | ==== VPS Magnets ==== | ||
| + | **Turn On** | ||
| + | * At the bottom of the 'VPS Magnets' | ||
| + | * Confirm that all flow controller power supply LEDs are green | ||
| + | * Click the 'All On' button for the magnet power supplies | ||
| + | * Confirm that all power supply LEDs are green and have ramped to their appropriate setpoints | ||
| + | **Turn Off** | ||
| + | * At the bottom of the 'VPS Magnets' | ||
| + | * Wait for the magnet power supplies to ramp down | ||
| + | * The ramp down will have finished when the readback for the current stops changing | ||
| + | * Click the 'All Off' button for the magnet power supplies | ||
| + | * Confirm that all magnet power supply LEDs are no longer green | ||
| + | * Click the 'All Off' button for the lead flows | ||
| + | * Confirm that all lead flow power supply LEDs are no longer green | ||
| ==== ARIS Magnets ==== | ==== ARIS Magnets ==== | ||
| ===== EXP ===== | ===== EXP ===== | ||