| - | == Steps == | + | == Open == |
| + | - Turn the Beam/ | ||
| + | - On the Main Magnets page, turn Dipole D5578 off on BBS/FFS tab; this will take a moment to ramp down to 0 A. | ||
| + | - On the MPS Operator page, turn E-Bends off. | ||
| + | - On the PPS rack, turn the Linac ACS key to Beam Permit. | ||
| + | - On the PPS rack, turn the key for Target RSS Ready For Beam to Off. | ||
| + | - Operator goes to room and starts a survey for entire area, or specific spot if required. | ||
| + | - After room fully surveyed and opened, on the PPS rack, turn the key for the opened room to Regulated Access. | ||
| + | == Close == | ||
| - | - Turn the Beam/Chopper off. | + | - On the PPS rack, turn the room key to Search Survey. |
| - | - Go to Main Magnets page through FRIB Launch. Go go the BBS/ | + | - Reset the warning alarms in area through the PPS rack. |
| - | - On MPS Operator page, turn E-Bends | + | - Perform search and evict of area. |
| - | - On the PPS machine, first turn the Linac ACS key to Beam Permit. Then, turn the key for Target RSS Ready For Beam to Off. | + | - Once all target areas are secured, turn the Target RSS Ready for Beam key to Yes. Wait a minute for the Target Facility lights to stop flashing and turn solid red. |
| - | - Operator | + | - Ensure you are in required machine mode for beam. |
| - | - After room is opened, on the PPS rack, flip the key for the opened room to Regulated Access. | + | - Turn the Linac ACS key back to Beam Permit. |
| + | - On the Main Magnets page, cycle the D5578 dipole to 90 A on the BBS/ | ||
| + | - Copy the current setpoint value. | ||
| + | - Turn on D5578 dipole (this will take a few seconds | ||
| + | - When the dipole is on, input 90 A into the setpoint value. | ||
| + | - When done ramping | ||
| + | - Wait for dipole to ramp to original value. | ||
| + | - On the MPS Operator page, turn the E-Bends | ||
| + | - On the Main Magnets page check that the E-Bends setpoint and readback values match on the V-LEBT tab. | ||
| + | - On the MPS Operator | ||
| + | - Check and clear all set MPS devices. | ||
| + | - Start the Chopper. | ||
| + | |||
| + | |||
| + | |||
| + | ===== Links ===== | ||