task:limiting_beam
Differences
This shows you the differences between two versions of the page.
| Both sides previous revisionPrevious revisionNext revision | Previous revision | ||
| task:limiting_beam [2024/09/30 09:43] – removed - external edit (Unknown date) 127.0.0.1 | task:limiting_beam [2025/07/08 05:35] (current) – harvey | ||
|---|---|---|---|
| Line 1: | Line 1: | ||
| + | ====== Limiting Primary Beam Power ====== | ||
| + | Please see the [[info: | ||
| + | ==== Chopper ==== | ||
| + | - Determine needed beam power by consulting AP and/or relevant destination power limits | ||
| + | - Note beam current on faraday cup D1102 | ||
| + | - Using current on faraday cup D1102 calculate current beam power | ||
| + | - Use this formula to determine your duty factor: (Needed power)/ | ||
| + | - Adjust repetition rate and pulse width to achieve needed duty factor | ||
| + | - Consult with AP, sometimes they will request you use a certain rep. rate or pulse width in your calculations | ||
| + | - Double check beam power with beam on D1102 | ||
| + | - Send! | ||
| + | |||
| + | ==== Attenuators ==== | ||
| + | - Determine needed beam power by consulting AP and/or relevant destination power limits | ||
| + | - Note beam current on faraday cup D1102 | ||
| + | - Using current on faraday cup D1102 calculate current beam power | ||
| + | - Use this formula to determine your attenuation factor: (Current power)/ | ||
| + | - Insert attenuator(s) whose product equals your attenuation factor | ||
| + | - Put beam back on D1102 and double check beam power, restart at step 5 if needed | ||
| + | - Send! | ||
| + | |||
| + | ==== Source Slits ==== | ||
| + | - Determine which source is providing primary beam | ||
| + | - Determine needed beam power by consulting AP, relevant destination power limits, or users. | ||
| + | - These next steps should be done simultaneously and are listed below | ||
| + | - Open or close __vertical__ top and bottom source slits in 0.1mm steps | ||
| + | - Wait 5 sec. between adjustments and watch beam power like a hawk | ||
| + | - Adjust slits in this manner until desired beam power is reached | ||
| + | * Some notes that may help you during tuning | ||
| + | * It is important you ONLY touch the vertical slits | ||
| + | * HPECR source has slit gap control, use this tool unless instructed otherwise | ||
| + | |||
| + | ====Shane Notes==== | ||
| + | * Primer on CW Beam might be good to start off the chopper section | ||
| + | * It'd be neat to include the " | ||
| + | * We can change attenuators with beam on D1102, due to how unreliable attenuators are I would prefer a new operator to keep beam on the cup and see the changes more or less in real time, helps build intuition | ||
| + | * All of these should reference the location of the pages, even if it changes in the future attenuators and slits can be hard to find for new guys | ||
| + | * Slits should keep the same center, this isn't clearly relayed for ARTEMIS slits | ||
| + | * Slits are used for smaller adjustments, | ||
