task:closing_area
Differences
This shows you the differences between two versions of the page.
Next revision | Previous revision | ||
task:closing_area [2024/10/08 10:21] – created painter | task:closing_area [2024/11/12 07:45] (current) – let dipole sit at max for a while pirkola | ||
---|---|---|---|
Line 1: | Line 1: | ||
- | ======= Closing | + | ======= Closing |
== Steps == | == Steps == | ||
- | - Reset the alarms in area through the PPS rack. | + | |
- | - First, turn the Target RSS Ready for Beam key back to Yes. Then turn the Linac ACS key back to Beam Permit. | + | |
- | - On the Main Magnets page, turn the D5578 dipole | + | - Perform search and evict of area. |
- | - Back on the MPS Operator page, turn the E-Bends on. | + | - Once all target areas are secured, turn the Target RSS Ready for Beam key to Yes. Wait a minute for the Target Facility lights to stop flashing and turn solid red. |
- | - Check that the dipoles for the V-LEBT | + | - Ensure you are in required machine mode for beam. |
+ | - Turn the Linac ACS key back to Beam Permit. | ||
+ | - On the Main Magnets page, cycle the D5578 dipole | ||
+ | - Copy the current setpoint value. | ||
+ | - Turn on D5578 dipole | ||
+ | - When the dipole is on, input 90 A into the setpoint value. | ||
+ | - When done ramping to 90 A, let it sit for about a minute. | ||
+ | - Paste the original setpoint value and set the magnet to it. | ||
+ | - Wait for dipole | ||
+ | - On the MPS Operator page, turn the E-Bends on. | ||
+ | - On the Main Magnets page check that the E-Bends setpoint and readback values match on the V-LEBT | ||
+ | - On the MPS Operator | ||
+ | - Check and clear all set MPS devices. | ||
- Start the Chopper. | - Start the Chopper. | ||
+ | |||
+ | |||
+ | |||
+ | ===== Links ===== | ||
+ | * [[clist> | ||
+ | * [[dcc> | ||
+ |
task/closing_area.1728397305.txt.gz · Last modified: 2024/10/08 10:21 by painter