dev:ebends [2025/08/27 01:22] – Added info to Tips/Notes as well as power supply PVs and page locations for their controls in the Devices/PV's section. lookdev:ebends [2025/08/30 04:50] (current) look
Line 1: Line 1:
 =====E-Bends===== =====E-Bends=====
-{{tag>WIP}} 
 ===Info=== ===Info===
-  * {{ :dev:first_e-bend.png?250|}}The E-Bends consist of two pairs of electrostatic plates with each plate having its own separate power supply.+  * The E-Bends consist of two pairs of electrostatic plates with each plate having its own separate power supply.
   * The E-bends are responsible for bending the beam by 90 degrees two times.   * The E-bends are responsible for bending the beam by 90 degrees two times.
-    * First bend: beam goes from ULEBT section down into the VLEBT section.+    * {{ :dev:first_e-bend.png?250|Diagram of the first E-Bend.}}First bend: beam goes from the ULEBT section down into the VLEBT section.
     * Second bend: beam goes from the VLEBT section and into the linac tunnel.     * Second bend: beam goes from the VLEBT section and into the linac tunnel.
   * The plates of the E-Bends are inside the beam line.   * The plates of the E-Bends are inside the beam line.
Line 12: Line 11:
   * Since the E-Bends act as beam inhibit devices, their power supplies are tied to the PPS.   * Since the E-Bends act as beam inhibit devices, their power supplies are tied to the PPS.
     * The Linac RSS system of the PPS must be in 'Beam Permit' before the PPS will allow the E-Bends' power supplies to be turned on.     * The Linac RSS system of the PPS must be in 'Beam Permit' before the PPS will allow the E-Bends' power supplies to be turned on.
-    * If 'Beam Permit' is lost while the E-Bends are on, the PPS will quickly ground each of the plates and turn off their power supplies. +    * If 'Beam Permit' is lost while the E-Bends are on, the PPS will quickly ground each of the plates and turn off their power supplies. 
  
 ===Tips/Notes=== ===Tips/Notes===
   * When taking the Linac RSS out of Beam Permit, it is good practice to block beam upstream of the E-Bends and then turn off their power supplies before turning the key in the PPS rack.   * When taking the Linac RSS out of Beam Permit, it is good practice to block beam upstream of the E-Bends and then turn off their power supplies before turning the key in the PPS rack.
-  * The controls for the E-Bend power supplies can be on found various pages. The most common page used by operators to turn the E-Bends on and off can be found by going to 'FRIB Launch Page' -> 'MPS Operator'. Other pages are given under the Devices/PV's section of this page.+  * The controls for the E-Bends' power supplies can be on found various pages. The most common page used by operators to turn the E-Bends on and off is the '[[pages:mps_op|MPS Operator]]page. Other pages are given under the Devices/PV's section of this page.
   * When trying to turn the E-Bend power supplies back on after a period of not being in Beam Permit, wait ~10-15 seconds after the Beam Permit LED on the PPS rack has turned solid red before attempting to do so. This will give the PVs time to reconnect to CS Studio and thus be able to receive commands from CS Studio pages.   * When trying to turn the E-Bend power supplies back on after a period of not being in Beam Permit, wait ~10-15 seconds after the Beam Permit LED on the PPS rack has turned solid red before attempting to do so. This will give the PVs time to reconnect to CS Studio and thus be able to receive commands from CS Studio pages.
   * All of the E-Bends power supplies should have similar voltage set point magnitudes with one supply in each pair being negatively biased.   * All of the E-Bends power supplies should have similar voltage set point magnitudes with one supply in each pair being negatively biased.
-  * At present (August 27, 2025), three of the E-Bend power supplies ramp to their set points relatively quickly and with their readbacks ending up within a few hundred millivolts of their setpoints. The first supply, however, ramps more slowly than the others and usually the readback shows a difference of about two volts from the setpoint. The LED for this supply will still show that it is ramping even though the supply is done ramping. This small difference shouldn't alter the beam in any meaningful way. +  * At present (August 27, 2025), three of the E-Bend power supplies ramp to their set points relatively quickly and with their readbacks ending up within a few hundred millivolts of their setpoints. The first supply, however, ramps more slowly than the others and usually the readback shows a difference of about two volts from the setpoint. The LED for this supply will still show that it is ramping even though the supply is done ramping. This small difference shouldn't alter the beam transmission in any meaningful way. 
  
 ===Location=== ===Location===
-  * The E-Bends are located at the top and bottom of the VLEBT section of the beamline.+The E-Bends are located at the top and bottom of the VLEBT section of the beamline.
 {{ :dev:e-bend_locations_in_front_end.png?800 |Diagram of the Front End. The E-Bends are located at the top and bottom of the VLEBT section.}} {{ :dev:e-bend_locations_in_front_end.png?800 |Diagram of the Front End. The E-Bends are located at the top and bottom of the VLEBT section.}}
  
Line 33: Line 33:
 These can be found by either going to 'FRIB Launch Page' -> 'Mag Main screens' -> 'Main Magnets' -> 'V-LEBT' or 'FRIB Launch Page' -> 'PS Main' -> 'LEBT'. The E-Bends can also be turned on and off from these pages as well. These can be found by either going to 'FRIB Launch Page' -> 'Mag Main screens' -> 'Main Magnets' -> 'V-LEBT' or 'FRIB Launch Page' -> 'PS Main' -> 'LEBT'. The E-Bends can also be turned on and off from these pages as well.
 ===Personnel=== ===Personnel===
 +There doesn't appear to be a single person/group in charge of the E-Bends. The power supplies themselves are probably owned by the [[https://portal.frib.msu.edu/sites/engineering/electrical/_layouts/15/WopiFrame.aspx?sourcedoc=%7b7b460567-337c-44f6-937e-dfb2701dccbb%7d&action=default&slrid=ee46f0a0-07db-9099-5ad5-ce7078e36218|Power Supply group]]. Any other problems with the E-Bends might be related to [[https://portal.frib.msu.edu/sites/accsystems/controlsandcomputing/_layouts/15/WopiFrame2.aspx?sourcedoc=%7b63ED5457-398D-40E6-973C-643314D0858C%7d|Controls/PPS group]].
  
 +----
 +  *Shane: I'd like to see an explicit labelling of them as dipoles, just to better cement what those are for new operators
 +  *Shane: you can link the MPS Opsrator page with [[pages:mps_op|this]]