| - | =====Radio Frequency Quadrupole(RFQ)===== | + | =====E-Bends===== |
| ===Info=== | ===Info=== | ||
| + | * The E-Bends consist of two pairs of electrostatic plates with each plate having its own separate power supply. | ||
| + | * The E-bends are responsible for bending the beam by 90 degrees two times. | ||
| + | * {{ : | ||
| + | * Second bend: beam goes from the VLEBT section and into the linac tunnel. | ||
| + | * The plates of the E-Bends are inside the beam line. | ||
| + | * In each pair, one plate is called the ' | ||
| + | * The E-Bends serve as beam inhibit devices as they ultimately determine whether or not beam can be sent into the linac tunnel to be accelerated. | ||
| + | * The plates are individually connected to a HV relay that prevents the plates from being charged from beam impact when the E-Bends' | ||
| + | * Since the E-Bends act as beam inhibit devices, their power supplies are tied to the PPS. | ||
| + | * The Linac RSS system of the PPS must be in 'Beam Permit' | ||
| + | * If 'Beam Permit' | ||
| ===Tips/ | ===Tips/ | ||
| + | * When taking the Linac RSS out of Beam Permit, it is good practice to block beam upstream of the E-Bends and then turn off their power supplies before turning the key in the PPS rack. | ||
| + | * The controls for the E-Bends' | ||
| + | * When trying to turn the E-Bend power supplies back on after a period of not being in Beam Permit, wait ~10-15 seconds after the Beam Permit LED on the PPS rack has turned solid red before attempting to do so. This will give the PVs time to reconnect to CS Studio and thus be able to receive commands from CS Studio pages. | ||
| + | * All of the E-Bends power supplies should have similar voltage set point magnitudes with one supply in each pair being negatively biased. | ||
| + | * At present (August 27, 2025), three of the E-Bend power supplies ramp to their set points relatively quickly and with their readbacks ending up within a few hundred millivolts of their setpoints. The first supply, however, ramps more slowly than the others and usually the readback shows a difference of about two volts from the setpoint. The LED for this supply will still show that it is ramping even though the supply is done ramping. This small difference shouldn' | ||
| ===Location=== | ===Location=== | ||
| + | The E-Bends are located at the top and bottom of the VLEBT section of the beamline. | ||
| + | {{ : | ||
| ===Devices/ | ===Devices/ | ||
| + | The PVs for the setpoints of the four power supplies for the E-Bend plates are: | ||
| + | * FE_LEBT: | ||
| + | * FE_LEBT: | ||
| + | * FE_LEBT: | ||
| + | * FE_LEBT: | ||
| + | These can be found by either going to 'FRIB Launch Page' -> 'Mag Main screens' | ||
| + | ===Personnel=== | ||
| + | There doesn' | ||
| - | + | ---- | |
| - | ===Personnel=== | + | |
| + | *Shane: you can link the MPS Opsrator page with [[pages: | ||