**Tuesday, April 29, 2014**
* Agenda
-CoBo firmware updates (Nathan)
-Overview of PAC 38 responses
**Tuesday, April 22, 2014**
* Agenda
-GET Configuration Program (Daniel)
-AT-TPC pulser data analysis (Saul)
**Tuesday, April 15, 2014**
* Agenda
-Noise measurement for GET and AT-TPC (Wolfi)
**Tuesday, April 8, 2014**
* Agenda
-Trigger geometry generation program (Daniel)
-Pad position convention update (Tan)
-Update on firmware issues (Faisal)
-Prototype gas test start (Saul)
**Tuesday, April 1, 2014**
* Agenda
-Commissioning Experiment Overview
**Tuesday, March 18, 2014**
* Agenda
-Commissioning Experiment Status
**Tuesday, March 11, 2014**
* Agenda
-Magnet cooling stopped (Daniel)
-Prep for next week's commissioning run
**Tuesday, March 4, 2014**
* Agenda
-Detector gas handling connected
-Micromegas pulser test (Daniel)
**Tuesday, February 25, 2014**
* Agenda
**Tuesday, February 18, 2014**
* Agenda
-Micromegas fitting problem (Daniel)
-DAQ trigger/time stamp
**Tuesday, February 11, 2014**
* Agenda
-AT-TPC attached to beamline/Hall probe and source arm installed (Daniel)
-Micromegas conditioning started (Saul)
-LN2 filling of magnet started (Daniel)
**Tuesday, February 4, 2014**
* Agenda
-Received 1st Micromegas (Daniel)
-AT-TPC setup vacuum considerations
-DAQ status (Faisal)
-Mutant/Firmware issues (Nathan)
**Tuesday, January 28, 2014**
* Agenda
-Micromegas update (Daniel)
-ZAP and shielding (Faisal, Daniel)
-Firmware update (Nathan)
**Tuesday, January 21, 2014**
* Agenda
-
**Tuesday, January 14, 2014**
* Agenda
-Micromegas manufacturing timeline (Daniel)
-CoBo testing (Faisal)
**Tuesday, December 17, 2013**
* Agenda
-Fusion cross sections for 124Sn experiment (Tan)
-Work with Mutant firmware for CoBo (Nathan)
-Start on ZAP design (Faisal)
**Tuesday, December 10, 2013**
* Agenda
-Endplate holder fixed (Daniel)
-Micromegas attachment discussion
**Tuesday, December 3, 2013**
* Agenda
-Planning for February AT-TPC run
-Endplate holder on cart to be fixed (Daniel)
**Tuesday, November 26, 2013**
* Agenda
-Micromegas details (Faisal)
-AT-TPC test experiment discussion
-Notre Dame 12B results (Saul)
**Tuesday, November 19, 2013**
* Agenda
-Placement of AT-TPC on cradle and cart and in solenoid (Daniel)
-Discussion on Micromegas
**Tuesday, November 12, 2013**
* Agenda
-Progress on AT-TPC cart and cradle (Daniel)
-Shutter doors being made, discussion on laser holes
**Tuesday, November 5, 2013**
* Agenda
-AT-TPC vacuum test with new copper plates (Daniel)
-AT-TPC cart assembly started
-124Sn(p,p) data (Tan)
**Tuesday, October 29, 2013**
* Agenda
-AT-TPC vacuum testing (Daniel)
**Tuesday, October 22, 2013**
* Agenda
-End plate modifications (Daniel)
-CoBo's received
**Tuesday, October 15, 2013**
* Agenda
-AT-TPC chamber pumping test (Daniel)
-AsAd cooling discussion
**Tuesday, October 8, 2013**
* Agenda
-End flange seal mounted, plan to pump detector (Daniel)
**Tuesday, October 1, 2013**
* Agenda
-AT-TPC assembly, Field cage, HV contact, accelerator tube assembled (Daniel)
-Micromegas traces (Faisal)
-ANL resonance histogram (Tan)
**Tuesday, September 24, 2013**
* Agenda
-Accelerator tube and cathode assembly update (Daniel)
-10Be angular distributions (Adam)
-STPC GET test results (Genie)
**Tuesday, September 17, 2013**
* Agenda
-Field cage and accelerator tube assembly update (Daniel)
-STPC GET test (Zibi)
**Tuesday, September 10, 2013**
* Agenda
-Accelerator tube assembly and last potential ring connection (Daniel)
-10Be analysis update (Adam)
**Tuesday, August 27, 2013**
* Agenda
-AT-TPC detector assembly (Daniel)
-3 AsAd test (Nathan)
**Tuesday, August 20, 2013**
* Agenda
-LHe liquifier received (Daniel)
-Assembly plans, leak checking going on (Daniel)
-ANL analysis update (Tan)
-Micromegas, CoBo firmware update (Faisal, Nathan)
**Tuesday, August 13, 2013**
* Agenda
-Notre Dame experiment summary (Tan)
-Update on AT-TPC parts (Saul)
-CoBo firmware update (Nathan)
-Discussion on tracking and visualization
**Tuesday, July 23, 2013**
* Agenda
-CoBo network and memory performance (Faisal)
-ND experiment prep (Saul)
-Test chamber results (Maxime, Elodie)
-Fission data analysis (Guillaume, Cathleen)
**Tuesday, July 16, 2013**
* Agenda
-Detector field cage assembly (Daniel, Josh)
-CoBo ethernet and firmware (Faisal, Nathan)
-ANL experiment analysis update (Tan)
-Test chamber fission measurement (Cathleen, Guillaume)
**Tuesday, July 9, 2013**
* Agenda
-Detector cathode assembly (Daniel, Josh)
-CoBo firmware update (Faisal, Nathan)
-Discussion about upcoming ND alpha decay run
-Cf source holder (Maxime)
**Tuesday, July 2, 2013**
* Agenda
-AT-TPC fabrication update (Daniel)
-ANL analysis update (Tan)
-Cf source measurements (Cathleen, Guillaume)
**Tuesday, June 25, 2013**
* Agenda
-Neural network work (Josh)
-10Be analysis (Adam)
-CoBo testing (Faisal)
-3-body decay charge deposit calculations (Guillaume)
**Tuesday, June 18, 2013**
* Agenda
-Introduction of 3 new students (Daniel)
-Field cage development update (Daniel)
-Summer experiment at Notre Dame (Saul)
-Laser testing results with test chamber (Maxime)
-Alpha range calculation for 12C 3-alpha decay (Guillaume)
-CoBo firmware update (Faisal)
-Multiplicy trigger update (Nathan)
-Measurements with fission source (Wolfi)
**Tuesday, May 28, 2013**
* Agenda
-Field cage development update (Daniel)
-Solenoid cooling update (Daniel)
-Laser testing results with test chamber (Saul)
-Diffusion calculation for 12B experiment (Maxime)
-Alpha range calculation for 12C 3-alpha decay (Guillaume)
-CoBo firmware update (Nathan)
**Tuesday, May 21, 2013**
* Agenda
-Status of LHe fill of Solenoid (Daniel)
-CoBo testing update (Faisal)
-12C 3-body decay simulation (Wolfi)
-Laser testing started (Saul)
**Tuesday, May 14, 2013**
* Agenda
-m-CoBo update, DDR2 memory, Flash, etc. test (Faisal)
-ANL analysis update (Tan)
-AT-TPC fabrication update (Daniel)
-Transfer LN2 to LN2 shield from He vessel (Daniel)
**Tuesday, May 7, 2013**
* Agenda
-Solenoid cooling status (Daniel)
-Laser safety review and future test plans (Saul)
-CoBo testing update (Daniel)
**Tuesday, April 30, 2013**
* Agenda
-CoBo shipping update (Daniel)
-10Be analysis update (Adam)
-Solenoid cooling started (Daniel)
-ANL upcoming experiment update (Tan)
-Work started on UV laser (Wolfi)
**Tuesday, April 23, 2013**
* Agenda
-Field cage update (Daniel)
-Experiment plans, ANL, Notre Dame
-Diode protection circuit discussion
-Update on time differences for ANL data (Tan)
**Tuesday, April 16, 2013**
* Agenda
-Field cage measurements (Daniel)
-ANL data sorting (Tan)
-CoBo Power (Faisal)
**Tuesday, April 9, 2013**
* Agenda
-Field cage cleaned (Daniel)
-ANL experiment magnetic field considerations
-plan to cool solenoid (Daniel)
-firmware adapting to full CoBo (Faisal)
-CoBo clock architecture (Faisal)
**Tuesday, April 2, 2013**
* Agenda
-124Sn Argonne test run update (Daniel)
-Field cage machined and received
-CoBo v.0.2 memory (Faisal)
-Gas handling update (Zach M)
**Tuesday, March 12, 2013**
* Agenda
-10Be data analysis update (Adam)
-ANL experiment details (Tan)
-progress on multiplicity trigger (Nathan, Tan)
**Tuesday, March 5, 2013**
* Agenda
-ANL experiment details (Tan)
-discussion on multiplicity trigger, sparking limit for Sn beams at ANL
-CoBo design update (Faisal)
-AsAd's ordered (Daniel)
-Discussion of card shielding
**Tuesday, February 26, 2013**
* Agenda
-ANL experiment scheduled (Tan)
-Multiplicity trigger discussion
-CoBo progress (Faisal)
**Tuesday, January 22, 2013**
* Agenda
-AT-TPC Project Timeline (Daniel)
-Notre Dame experiment prep
-CoBo memory debugging (Faisal)
**Tuesday, January 15, 2013**
* Agenda
-CoBo work, VxWorks image generation (Faisal, Shelbi, Patrick)
-Discussion of mesh signals for fission fragments
**Tuesday, January 8, 2013**
* Agenda
-New Micromegas update
-Notre Dame experiment scheduled
**Tuesday, December 11, 2012**
* Agenda
-Field cage received (Daniel)
-Drawings submitted to shop
-Cobo development update (Faisal)
-Prototype Micromegas design update (Saul)
**Tuesday, December 4, 2012**
* Agenda
-GET controller and Micromegas testing (Tan, Ian)
-Micromegas design update (Faisal)
**Tuesday, November 27, 2012**
* Agenda
-AT-TPC event generator (Daniel)
-GET software update (Tan, Nathan)
-Prototype Micromegas pad design (Saul)
-Cobo Gigabit ethernet (Faisal)
**Tuesday, November 20, 2012**
* Agenda
-Detector drawing almost approved (Daniel)
-Prototype Micromegas Pad design (Saul)
-CoBo Gigabit work (Faisal)
**Tuesday, November 13, 2012**
* Agenda
-AT-TPC cart design (Daniel)
-GET Controller software updated (Nathan)
**Tuesday, November 8, 2012**
* Agenda
-Plans to order AGET chips (Daniel)
-GET debugging (Nathan)
**Tuesday, October 30, 2012**
* Agenda
-AT-TPC fabrication progress (Daniel)
-Gas handling update (Zach)
**Tuesday, October 23, 2012**
* Agenda
**Tuesday, October 16, 2012**
* Agenda
**Tuesday, October 9, 2012**
* Agenda
-AT-TPC design approval in process (Daniel)
-Saclay AsAd 1.1 test after repair (Tan)
-CoBo firmware updated for use with multiple reduced CoBo's (Nathan)
-MCP testing setup (Adam)
**Tuesday, October 2, 2012**
* Agenda
-Fixed regulator for Saclay AsAd 1.1 (Tan)
-Agiltron test (Saul)
-Reduced CoBo update (Nathan)
-Micromegas PCB update (Faisal)
-8Be kinematics (Aimee)
**Tuesday, September 25, 2012**
* Agenda
-Comparison of Daisuke's analysis of 6He elastic scattering data (Aimee)
-Saclay AsAd 1.1 testing (Tan, Aimee, Nathan)
-CoBo firmware for ethernet frames update (Nathan)
-CoBo processor status (Faisal)
**Tuesday, September 18, 2012**
* Agenda
-Field cage fabrication started (Daniel)
-Hit pattern and thresholds test for GET (Tan, Aimee)
-New pump and compressor update (Zach)
-MCP testing setup (Adam)
-Pad design (Faisal)
**Tuesday, September 11, 2012**
* Agenda
-AT-TPC source arm design update (Daniel)
-Test chamber data, micromegas troubleshooting (Tan, Aimee)
-CoBo update and micromegas pad design (Faisal)
**Tuesday, September 4, 2012**
* Agenda
-GET electronics, testing saturation problem (Tan, Aimee)
-Gas handling, compressor and pump update (Zach)
-10Be analysis (Adam)
-Pad design implementation status (Faisal)
**Tuesday, August 28, 2012**
* Agenda
-AT-TPC magnet yoke assembled and put in place (Daniel)
-AT-TPC design updates, Gas flow tube size for flow rate (Daniel)
-Ring cutter design (Daniel)
-GET multiplicity measurements (Tan, Aimee)
**Tuesday, August 14, 2012**
* Agenda
-GET testing update (Tan, Aimee)
-10Be analysis (Adam)
-Field cage ring construction (Ian, Wolfi)
-CoBo update (Faisal)
**Tuesday, August 7, 2012**
* Agenda
-Fission source measurements (Remi, Malek, Tan)
-GET software problems
-Pad plane design, research on laser, AT-TPC Mechanical Design Review (Saul)
-10Be + alpha data analysis update (Adam)
-CoBo, DDR memory testing (Faisal)
**Tuesday, July 31, 2012**
* Agenda
-Problems and progress on fission source measurement in test chamber (Remi, Malek, Tan)
-CoBo update (Faisal)
**Tuesday, July 24, 2012**
* Agenda
-Micromegas pad pattern with fine pitch area (Saul)
-8Be statistics update (Aimee)
-Tiled micromegas data taking and mapping (Remi, Malek, Tan)
-GET electronics testing (Wolfi, Tan)
-CoBo testing/ZAP update (Faisal)
**Tuesday, July 17, 2012**
* Agenda
-More data taken for tiled resitive micromegas (Malek, Remi, Tan)
-Gas tube progress (Ian)
-Prototype CoBo boards received (Faisal)
**Tuesday, July 10, 2012**
* Agenda
-Tiled micromegas measurements (Malek, Remi, Tan)
-10Be angle measurements (Adam)
-CoBo and ZAP update (Faisal)
**Tuesday, July 3, 2012**
* Agenda
-Considerations for ZAP/AsAd mounting, shielding, cooling
-GET electronics testing started (Tan, Faisal)
-Micromegas pad design considerations (Saul)
-Allene test results (Malek, Remi)
**Tuesday, June 26, 2012**
* Agenda
-Endplate design details (Daniel)
-10Be + 6He analysis (Adam)
-Gas handling parts ordered (Zach)
-Plan for gas tubes for Prototype (Ian)
-GET software installation and testing plans (Tan, Daniel)
-Pad simulation update (Saul)
**Tuesday, June 19, 2012**
* Agenda
-Allene measurements (Malek, Remi)
-8,9Be analysis (Aimee)
-MCP housing modifications (Adam)
-CoBo update (Faisal)
**Tuesday, June 12, 2012**
* Agenda
-Pad geometry simulation (Saul)
-GET software update (Nathan)
-CoBo and ZAP update (Faisal)
**Tuesday, June 5, 2012**
* Agenda
-Allene testing (Malek, Remi, Tan)
-Micromegas pad simulation results (Saul)
-Be analysis (Aimee)
-ZAP design (Faisal)
**Tuesday, May 29, 2012**
* Agenda
-End plate developments (Daniel)
-Gas mixture (Ar-H2) measurements (Malek, Remi, Tan)
-Be fusion analysis (Aimee)
-ZAP design (Faisal)
**Tuesday, May 22, 2012**
* Agenda
-End plate prototype (Daniel)
-Physics discussion meetings to start
**Thursday, May 10, 2012**
* Agenda
-Solenoid enclosure and magnetic field considerations (Daniel)
-ZAP design considerations (Daniel)
-GET raw data unpacking (Tan)
-CoBo quotes (Faisal)
-Agiltron micromegas testing (Saul, Wolfi)
**Thursday, May 3, 2012**
* Agenda
-ATTPC final design almost ready. HV was ordered this morning. (Daniel)
-Gas handling system (Zach)
-Test with micromegas from Agiltron (Wolfi)
-Conditioning of micromegas, simulation progress (Saul)
-Board designed about to be submitted (Faisal)
-9Be and 8Be (Aimee)
-Repairing MCP housing, root code (Adam)
**Thursday, April 25, 2012**
* Agenda
-GET software fully compiled in MAC (Nathan is fixing some bugs) (Daniel)
-Gas handling system (Zach/John)
-Shielding of the solenoid (Wolfi)
-Conditioning of micromegas (Saul)
-SBIR will send commercial micromegas to test (Wolfi)
-9Be and 8Be (Aimee)
-Repairing MCP housing (Adam)
**Thursday, April 19, 2012**
* Agenda
-Power supply quote (Daniel)
-Conditioning of micromegas (Tan and Saul)
-Mapping on the way while waiting for the connectors to arrive (Daniel and Ian)
-Mechanical design almost ready. Working in a transportation cart for the detector (Daniel)
-9Be and 8Be (Aimee)
-Simulation in progress (Saul)
-Dineutron FRESCO simulation (Adam)
**Thursday, April 12, 2012**
* Agenda
-AGET, AsAd update and plans for testing (Nathan)
-Proposal for fission studies with Prototype (Bill)
**Thursday, April 5, 2012**
* Agenda
-AsAd pinout (Nathan)
-Plans for conditioning micromegas and test electronics
-Discussion on programmable ZAP
-Magnet yoke, fringe field calculations underway (Daniel)
-Search for 8Be (Aimee)
**Thursday, March 29, 2012**
* Agenda
-Power supply quotes (Daniel)
-Search for 9Be (Aimee)
-Discussion on amplifiers and linear circuits
-Gas handling system update (Zach)
-COBO update (Faisal)
**Thursday, March 23, 2012**
* Agenda
-AT-TPC flange design (Daniel)
-AGET testing and COBO progress (Nathan, Faisal)
-Micromegas pad design considerations (Saul)
**Thursday, March 1, 2012**
* Agenda
- Solenoid field calculations (Daniel)
- ND experiment Prep
- AGET testing update (Nathan)
**Thursday, February 23, 2012**
* Agenda
- Samurai TPC pad plane (Jon Barney)
- AT-TPC flange design (Daniel)
- Allene test results (Tan)
- 6He data analysis (Aimee)
- ND experiment trigger (Wolfi)
**Thursday, February 16, 2012**
* Agenda
- Prep for ND experiment
- Ar + H2 tests (Tan, Saul)
- COBO DDR update (Faisal)
**Wednesday, February 8, 2012**
* Agenda
- Prep Issues for ND experiment, adapter piece for MCP/Prototype (Adam, Tan)
- COBO update (Faisal)
- Gas Handling update (Zach)
**Thursday, February 3, 2012**
* Agenda
- Update from Bob Flight on AT-TPC design (Daniel)
- Adaptor Board status (Tan, Ian)
- AGET testing update (Nathan)
- Gas Handling update, discussion of need for recirculation and gas chromatagraph (Zach, John)
**Thursday, January 26, 2012**
* Agenda
- NIM signal to T2K test (Tan)
- Resistive Micromegas Adapter board (Ian)
- COBO, crate setup (Faisal)
- Gas handling system update (Zach)
**Thursday, January 19, 2012**
* Agenda
- Ar + H2 mixture test results (Wolfi, Tan, Ian)
- Notre Dame experiment scheduling and needs
- AGET testing to be planned (Nathan)
- COBO update, issues with DDR memory (Faisal)
- Gas handling system requirements (John)
- ND date analysis (Adam, Aimee)
**Thursday, January 12, 2012**
* Agenda
- Test of resistive micromegas, Adapter board (Tan, Ian)
- Plan for Ar+H test (Wolfi, Tan, Ian)
- some thoughts about ND experiment trigger
- Gas handling system update (Zach)
- Micromegas pad design
**Thursday, January 5, 2012**
* Agenda
- AT-TPC Design update, chamber shortened (Daniel)
- Resistive Micromegas Adapter board (Ian)
- AGET testing (Nathan)
- COBO update (Faisal)
- Allene info (Tan)
**Thursday, December 22, 2011**
* Agenda
- AT-TPC Design update
- COBO, change from 3 to 1 data format (Nathan)
**Thursday, December 15, 2011**
* Agenda
- Resistive Micromegas, possibilities for capacitance measurement
- Plan to test different gas mixtures (Ar+H, allene), (Ian)
- Design of resistive Micromegas adapter board (Ian)
**Thursday, December 8, 2011**
* Agenda
- Resistive Micromegas Simulations (Wolfi)
- GET meeting: GET board presented (Faisal)
- need to test logic in chip
- hit pattern recognition possible?
**Thursday, November 3, 2011**
* Agenda
- ND experiment in October (DS)
- GET (Nathan)
**Thursday, September 15, 2011**
* Agenda
- CoBo (Nathan)
- ND experiment in October (DS)
- MCP (Adam/Wes)
**Thursday, September 08, 2011**
* Agenda
- ND experiment in October (DS)
- Design effort/ Gas handling (Daniel)
- ND visit & MCP (Adam/Wes)
- GET (Nathan)
- Testing of Micromegas with pulser(Wolfi)
**Thursday, September 01, 2011**
* Agenda
- Test chamber with ZAP/ ND experiment in October (DS)
- PCB for MCP (Adam/Wes)
- CoBo (Nathan)
**Thursday, August 25, 2011**
**Thursday, August 11, 2011**
* Agenda
- Test chamber with ZAP (DS)
- CoBo (Nathan)
- Analysis of ND fusion data (Aimee)
- Gas handling system (John)
**Thursday, August 4, 2011**
* Agenda
- Analysis of ND data (DS)
- CoBo (Nathan)
- Analysis of ND fusion data (Aimee)
**Thursday, July 28, 2011**
* Agenda
- Range analysis for hydrogen (Fred)
- Correlation between pads of Micromegas (Fabien)
- New AsAd board (Nathan)
- MCP (Adam)
- Resistive Micromegas (Wolfi)
**Thursday, July 21, 2011**
* Agenda
- ReA3 layout (Fernando)
- Delay line (Adam/Aimee)
- Resistive Micromegas (Wolfi)
- Range analysis for hydrogen (Fred)
- Correlation between pads of Micromegas (Fabien)
- Gas handling system (John)
- Spring connector (Bill)
- ZAP/Micromegas for Prototype (Wes)
**Thursday, July 14, 2011**
* Agenda
- ReA3 layout (Fernando)
- Samurai TPC (Rebecca)
- CoBo (Nathan/Faisal)
- Gas handling system (John)
- Correlation between pads of Micromegas (Fabien/Fred)
**Thursday, July 7, 2011**
* Agenda
- CoBo (Nathan/Faisal)
- Narval (Eugene)
- Delay line for the MCP (Adam/Aimee)
- Analysis of the hydrogen data / Pad response (Fabien/Fred)
**Thursday, June 30, 2011**
* Agenda
- Test of hydrogen (Dany)
- Analysis of the hydrogen data (Fabien)
- Simulation of the pad responses (Fred)
- Narval (Eugene/Fred)
- CoBo (Nathan/Faisal/Gilles)
- Delay line for the MCP (Adam)
- Resistive Micromegas (Aimee)
**Thursday, June 23, 2011**
* Agenda
- CoBo/AsAd (Nathan)
- uTCA (Faisal)
- ND analysis (DS)
- Hydrogen test (Dany)
- Charge division (Aimee)
- Analysis of H2 data (Fred/Fabien)
**Thursday, June 16, 2011**
* Agenda
- ND beam monitor / ND analysis (DS)
- Hydrogen test (Dany)
- Reaction calculation (Adam)
- CoBo status (Nathan)
- Design of the AT-TPC (Daniel)
**Thursday, June 9, 2011**
* Agenda
- ND beam development (DS)
- P10 test (Eugene)
- MCP (Adam, Aimee)
- CoBo status (Nathan)
**Thursday, June 2, 2011**
* Agenda
- Test of hydrogen/P10 (Dany)
- He+Isobutane/ ND beam development (DS)
- MCP (Adam, Aimee)
- CoBo status (Faisal)
**Thursday, May 26, 2011**
* Agenda
- Preparation for ND fall/ He+Isobutane (DS)
- MCP (Adam, Aimee)
- AsAd status (Nathan)
- CoBo status (Faisal)
**Thursday, May 19, 2011**
* Agenda
- Test of hydrogen gas (Eugene, Dany)
- Analysis of the Notre Dame data (DS)
- MCP (Adam, Aimee)
- AsAd status (Nathan)
- CoBo status (Faisal)
- Gas handling system test (John)
**Thursday, May 12, 2011**
* Agenda
- Analysis of the Notre Dame data (DS)
- Test of hydrogen gas (Eugene, Dany)
- Resistive Micromegas (Wolfi)
- MCP (Adam, Aimee)
- AsAd status (Nathan)
**Thursday, May 5, 2011**
**Thursday, April 28, 2011**
* Agenda
- Commissioning at Notre Dame(DS)
**Thursday, March 17, 2011**
* Agenda
- Schedule of transport(DS)
- Upgraded T2K (Eugene)
- Reduced CObo (Nathan)
- MCP(Adam)
**Thursday, March 10, 2011**
* Agenda
- Visit to ND (DS)
- Upgraded T2K (Eugene)
- Stay at Saclay (Nathan)
- MCP(Adam)
**Thursday, March 3, 2011**
* Agenda
- Analysis of the wire plane (Lu)
- Prototype AT-TPC (DS)
- Upgraded T2K (Eugene)
- GET (Faisal)
- Power Supply (Daniel)
**Thursday, February 24, 2011**
* Agenda
- Prototype AT-TPC: Uniformity, time dependence (DS)
- Power supply for GET (Eugene)
- MCP & beam window foil (Adam)
- Visit to Saclay (Nathan)
- Gas handling system (John)
**Thursday, February 17, 2011**
* Agenda
- ZAP (Mike)
- Trigger (Wolfi)
- MCP (Adam)
- Matsusada Power Supply (Daniel)
**Thursday, February 10, 2011**
* Agenda
- The beam line ladder (Mike)
- Gas handler (John)
- The Prototype AT-TPC (DS)
- Reduced Cobo (Nathan)
- Upgraded T2K and its support(Eugene)
- Cross talk of the PCB (Bill)
- Preliminary Project Plan (Daniel)
**Thursday, February 3, 2011**
* Agenda
- The Prototype AT-TPC (DS)
- Upgraded T2K, grounding of the GET (Eugene)
- micro TCA (Faisal, Nathan)
- Gas handler (John)
**Thursday, January 27, 2011**
* Agenda
- Designing of the AT-TPC (Marius)
- The Prototype AT-TPC (DS)
- Upgraded T2K, grounding of the GET (Eugene)
**Friday, January 14, 2011**
* Agenda
- The Prototype AT-TPC (DS)
- Designing of the AT-TPC (Marius)
- Designing of the ZAP (Mike)
- Status of the Prototype GET (Nathan)
**Thursday, January 6, 2011**
* Agenda
- The DAQ, the new T2K (Eugene)
- The Prototype AT-TPC (DS)
- Designing of the AT-TPC (Marius)
- Development of the gas handler (John)
- Micro TCA (Faisal)
- Status of the Prototype GET (Nathan)
**Thursday, December 30, 2010**
**Thursday, December 16, 2010**
* Agenda
- Update of the Prototype AT-TPC (DS/Eugene)
- Commissioning at ND (DS)
- New T2K (Eugene)
- Status of the stay of Nathan in Bordeaux (Daniel/Faisal)
**Thursday, December 9, 2010**
* Agenda
- Update of the Prototype AT-TPC (DS)
- DAQ system for the GET (Eugene)
- Reduced CoBo update (Faisal)
**Thursday, December 2, 2010**
* Agenda
- Update of the Prototype AT-TPC (DS)
- Reduced CoBo update (Nathan)
**Thursday, November 18, 2010**
* Agenda
- Update of the Prototype AT-TPC (DS)
- Design of the AT-TPC (Marius)
- Reduced CoBo update (Nathan)
**Thursday, November 11, 2010**
* Agenda
- Commissioning at ND (DS)
- Reduced CoBo update (Nathan)
**Thursday, November 4, 2010**
* Agenda
- Update of testing of the Prototype AT-TPC (DS)
- Reduced CoBo update (Nathan)
- Design of the Field Cage (Jon)
**Thursday, October 28, 2010**
* Agenda
- The cathode power supply issue (DS)
- Conditioning of the Micromegas (Mike)
- Reduced CoBo update (Nathan)
- Testing of the CO2 trap (John/Mike)
- Design of the Field Cage (Jon)
**Thursday, October 21, 2010**
* Agenda
- Testing of the CO2 trap (Mike)
- The control software of power supplies (Eugene)
- Assembly of the Prototype AT-TPC (DS/Mike)
**Friday, October 15, 2010**
* Agenda
- Report on the visit of CEA-Saclay (Nathan/Eugene)
**Thursday, October 7, 2010**
* Agenda
- Assembly of the Prototype AT-TPC (DS)
**Thursday, September 30, 2010**
* Agenda
- Micromegas fabrication at Saclay (Mike/Bill)
- Progress on assembly of prototype detector (Daisuke)
**Thursday, September 23, 2010**
* Agenda
- Cable & remote control of high voltage power supply (Eugene)
- Status of fabrication of Micromegas (Daisuke)
- Status of hydrogen/deuterium safety (Daisuke)
- Status of assembly of Prototype AT-TPC (John/Jon/Daisuke)
- Status of testing of the CO2 trap (John)
- Reduced CoBo/Prototype GET plan (Nathan)
**Thursday, September 16, 2010**
**Thursday, September 9, 2010**
**Thursday, September 2, 2010**
**Thursday, August 26, 2010**
* Agenda
- Progress on prototype fabrication and assembly (Mike)
- Cathode voltage feedthru for the AT-TPC (Eugene)
- Progress on wire plane tests (Daisuke)
**Thursday, August 12, 2010**
**Thursday, August 5, 2010**
* Agenda
- GET status (Nathan)
- Laser calibration system (Justin/Mike)
- Gas handling system for the Prototype (DS)
**Thursday, July 29, 2010**
* Agenda
- Design of the AT-TPC (Harry)
- The status of the analysis of the Micromegas test (Anthony)
**Thursday, July 22, 2010**
* Agenda
- Review of the gas handling system of the AT-TPC (John/Ana)
- GET power supply / Remote control system (Eugene)
**Thursday, July 15, 2010**
* Agenda
- Status of testing of Micromegas (Anthony/Claire)
- Status of MCP design (Justin)
- Misc. information (DS)
**Thursday, July 8, 2010**
* Agenda
- Status of the design of the Prototype (Daisuke)
- Status of the new test room (Bill)
- Multi-pin connector connection test kit with LED (Mike)
- Laser & X-Y table (Mike/Justin)
- Misc (Hydrogen gas, Gas handling system review, Power supply)
**Thursday, July 1, 2010**
**Thursday, June 24, 2010**
* Agenda
- review released drawing for the prototype from B. Flight, before sending to J. Ottarson for final design review (Daisuke)
- progress on testing of gas mixtures and energy resolution (Claire)
- suggestions for organization of test area (Bill)
- Announcements (Daniel)
**Thursday, June 17, 2010**
* Agenda
- Update of the design of the AT-TPC (Harry)
- Status of the test of Micromegas (Claire/Justin/Anthony){{:wm_6-17-2010.pptx| Slides}}
**Thursday, June 10, 2010**
* Agenda
- Update of the design of the Prototype AT-TPC (DS)
**Thursday, June 3, 2010**
* Agenda
- Status of move to new testing area and test setup (Daisuke){{:wm_6-03-2010_ds.pptx| Slides}}
- Discussion of milestone dates for prototype (Daisuke/Daniel)
- Status of CoBo development (and other DAQ components?) (Nathan)
**Thursday, May 27, 2010**
* Agenda
- New test area organization and progress (Daisuke)
- Tests of micromegas - resolution with alpha source (Claire){{:wm_5-27-2010.pptx| Slides}}
- Preparation of issues to discuss with Bob Flight at next meeting this coming Friday
- Breakdown of AT-TPC project in sub-projects (Daniel)
**Thursday, May 20, 2010**
* Agenda
- New test room update
- Testing of Micromegas; reduction of negative cross talk {{:wm_5-20-2010.pptx| Slides}}
- ANSYS for studying mechanical characteristics of the AT-TPC
- Design of Prototype AT-TPC at Rochester
**Thursday, May 13, 2010**
* Agenda
- Testing of micromegas in test chamber {{:wm_5-13-2010_ds.pptx| Slides}}
- Status of clean room and its infrastructure
- Status of connector board prototype
- Prototype design at Rochester / organization of follow-up weekly meetings
- Possibility of collaboration with Lawrence Livermore National Laboratory
**Thursday, May 6, 2010**
* Agenda
- Status of clean room and schedule of move to new testing/assembly area {{:wm_5-06-2010_ds.pptx| Slides}}
- Micromegas tests: status and issues
- Discussion about a laser calibration system {{:wm_5-06-2010_hm_lasercalibration.pptx| Slides}}
- Gas handling system design status (feedback on work order, path forward)
**Thursday, April 29, 2010**
* Agenda
- Status of clean room (Daisuke){{:wm_4-29-2010_ds.pptx| Slides}}
- Test of micromegas with new connectors (Mike/Daisuke)
- Concept drawing for TPC angle mechanism (Harry)
**Thursday, April 22, 2010**
* Agenda
- Design of prototype in Rochester (Daisuke)
- Gas handling system design (Fernando/Ana)
- Clean room construction (Daniel/Daisuke)
- Connector assembly prototype (Mike)
- Discussion about items that should be procured ASAP (Bill)
- Miscellaneous
**Thursday, April 15, 2010**
**Thursday, April 8, 2010**
* {{:wm_4-08-2010_minute.docx|Minute}}
* Agenda
- The status of the CoBo (NU) [[https://project-actar-get.cea.fr/Groups/100_todolist/400_wp4_data_acquisi/slides_-_presentatio/workgroup_contents| Slides]]
- The individual bias circuit and the insertion test kit of the Micromegas (MF)
**Thursday, April 1, 2010**
* {{:wm_4-01-2010_minute.docx|Minute}}
* Agenda
- Micromegas design submission (MF) {{:wm_4-01-2010_mf_micromegas.pptx| Slides}}
- Test field cage (WM)
- Status of the project management (DS) {{:wm_4-01-2010_ds.pptx| Slides}}
- Forthcoming events (WM)
**Thursday, March 25, 2010**
* {{:wm_3-25-2010_minute.docx|Minute}}
* Agenda
- Capacitance measurement of Micromegas (MF) {{:wm_3-25-2010_micromegas_capa_mf.pptx| Slides}}
- Status of the Prototype design (WM/DS)
**Thursday, March 18, 2010**
* {{:wm_3-18-2010_minute.docx|Minute}}
* Agenda
- Electric field simulation (FM) {{:wm_3-18-2010_fm_garfield.ps| Simulation result}}
- Filed cage design (DS) {{:wm_3-18-2010_dsx.pdf| Slides}}
- ZAP design (WL) [[https://project-actar-get.cea.fr/Groups/100_todolist/200_wp2_front_end_el/zap/slides-presentation/protection_unit_pres6362/view| ZAP circuit design]] {{:zap_integration_at-tpc_2010-3-15_x.pdf|ZAP integration}}
- Micromegas capacitance (WM)
- Purchasing of a scroll pump (FM/DS)