-**Tuesday, April 15, 2014** +** Analysis meeting ** 
-  * Agenda +  Wednesdays at 3:00PM EST 
-  -Noise measurement for GET and AT-TPC (Wolfi)+  Zoom link: [[https://msu.zoom.us/j/93713496495]] 
 +   
 +** Progress meeting *
 +  Thursdays at 3:00PM EST 
 +   
 +** [[Archive]] (2010-2014**
  
-**Tuesday, April 8, 2014** 
-  * Agenda 
-  -Trigger geometry generation program (Daniel) 
-  -Pad position convention update (Tan) 
-  -Update on firmware issues (Faisal) 
-  -Prototype gas test start (Saul) 
- 
-**Tuesday, April 1, 2014** 
-  * Agenda 
-  -Commissioning Experiment Overview 
- 
-**Tuesday, March 18, 2014** 
-  * Agenda 
-  -Commissioning Experiment Status 
- 
-**Tuesday, March 11, 2014** 
-  * Agenda 
-  -Magnet cooling stopped (Daniel) 
-  -Prep for next week's commissioning run 
- 
-**Tuesday, March 4, 2014** 
-  * Agenda 
-  -Detector gas handling connected 
-  -Micromegas pulser test (Daniel) 
- 
-**Tuesday, February 25, 2014** 
-  * Agenda 
- 
-**Tuesday, February 18, 2014** 
-  * Agenda 
-  -Micromegas fitting problem (Daniel) 
-  -DAQ trigger/time stamp 
- 
-**Tuesday, February 11, 2014** 
-  * Agenda 
-  -AT-TPC attached to beamline/Hall probe  and source arm installed (Daniel) 
-  -Micromegas conditioning started (Saul) 
-  -LN2 filling of magnet started (Daniel) 
- 
-**Tuesday, February 4, 2014** 
-  * Agenda 
-  -Received 1st Micromegas (Daniel) 
-  -AT-TPC setup vacuum considerations 
-  -DAQ status (Faisal) 
-  -Mutant/Firmware issues (Nathan) 
- 
-**Tuesday, January 28, 2014** 
-  * Agenda 
-  -Micromegas update (Daniel) 
-  -ZAP and shielding (Faisal, Daniel) 
-  -Firmware update (Nathan) 
- 
-**Tuesday, January 21, 2014** 
-  * Agenda 
-  - 
- 
-**Tuesday, January 14, 2014** 
-  * Agenda 
-  -Micromegas manufacturing timeline (Daniel) 
-  -CoBo testing (Faisal) 
- 
-**Tuesday, December 17, 2013** 
-  * Agenda 
-  -Fusion cross sections for 124Sn experiment (Tan) 
-  -Work with Mutant firmware for CoBo (Nathan) 
-  -Start on ZAP design (Faisal) 
- 
-**Tuesday, December 10, 2013** 
-  * Agenda 
-  -Endplate holder fixed (Daniel) 
-  -Micromegas attachment discussion 
- 
-**Tuesday, December 3, 2013** 
-  * Agenda 
-  -Planning for February AT-TPC run 
-  -Endplate holder on cart to be fixed (Daniel) 
- 
-**Tuesday, November 26, 2013** 
-  * Agenda 
-  -Micromegas details (Faisal) 
-  -AT-TPC test experiment discussion 
-  -Notre Dame <sup>12</sup>B results (Saul) 
- 
-**Tuesday, November 19, 2013** 
-  * Agenda 
-  -Placement of AT-TPC on cradle and cart and in solenoid (Daniel) 
-  -Discussion on Micromegas 
- 
-**Tuesday, November 12, 2013** 
-  * Agenda 
-  -Progress on AT-TPC cart and cradle (Daniel) 
-  -Shutter doors being made, discussion on laser holes 
- 
-**Tuesday, November 5, 2013** 
-  * Agenda 
-  -AT-TPC vacuum test with new copper plates (Daniel) 
-  -AT-TPC cart assembly started 
-  -<sup>124</sup>Sn(p,p) data (Tan) 
- 
-**Tuesday, October 29, 2013** 
-  * Agenda 
-  -AT-TPC vacuum testing (Daniel) 
- 
-**Tuesday, October 22, 2013** 
-  * Agenda 
-  -End plate modifications (Daniel) 
-  -CoBo's received 
- 
-**Tuesday, October 15, 2013** 
-  * Agenda 
-  -AT-TPC chamber pumping test (Daniel) 
-  -AsAd cooling discussion 
- 
-**Tuesday, October 8, 2013** 
-  * Agenda 
-  -End flange seal mounted, plan to pump detector (Daniel) 
- 
-**Tuesday, October 1, 2013** 
-  * Agenda 
-  -AT-TPC assembly, Field cage, HV contact, accelerator tube assembled (Daniel) 
-  -Micromegas traces (Faisal) 
-  -ANL resonance histogram (Tan) 
- 
-**Tuesday, September 24, 2013** 
-  * Agenda 
-  -Accelerator tube and cathode assembly update (Daniel) 
-  -10Be angular distributions (Adam) 
-  -STPC GET test results (Genie) 
- 
-**Tuesday, September 17, 2013** 
-  * Agenda 
-  -Field cage and accelerator tube assembly update (Daniel) 
-  -STPC GET test (Zibi) 
- 
-**Tuesday, September 10, 2013** 
-  * Agenda 
-  -Accelerator tube assembly and last potential ring connection (Daniel) 
-  -10Be analysis update (Adam) 
- 
-**Tuesday, August 27, 2013** 
-  * Agenda 
-  -AT-TPC detector assembly (Daniel) 
-  -3 AsAd test (Nathan) 
- 
-**Tuesday, August 20, 2013** 
-  * Agenda 
-  -LHe liquifier received (Daniel) 
-  -Assembly plans, leak checking going on (Daniel) 
-  -ANL analysis update (Tan) 
-  -Micromegas, CoBo firmware update (Faisal, Nathan) 
- 
-**Tuesday, August 13, 2013** 
-  * Agenda 
-  -Notre Dame experiment summary (Tan) 
-  -Update on AT-TPC parts (Saul) 
-  -CoBo firmware update (Nathan) 
-  -Discussion on tracking and visualization 
- 
-**Tuesday, July 23, 2013** 
-  * Agenda 
-  -CoBo network and memory performance (Faisal) 
-  -ND experiment prep (Saul) 
-  -Test chamber results (Maxime, Elodie) 
-  -Fission data analysis (Guillaume, Cathleen) 
- 
-**Tuesday, July 16, 2013** 
-  * Agenda 
-  -Detector field cage assembly (Daniel, Josh) 
-  -CoBo ethernet and firmware (Faisal, Nathan) 
-  -ANL experiment analysis update (Tan) 
-  -Test chamber fission measurement (Cathleen, Guillaume) 
- 
-**Tuesday, July 9, 2013** 
-  * Agenda 
-  -Detector cathode assembly (Daniel, Josh) 
-  -CoBo firmware update (Faisal, Nathan) 
-  -Discussion about upcoming ND alpha decay run 
-  -Cf source holder (Maxime) 
- 
-**Tuesday, July 2, 2013** 
-  * Agenda 
-  -AT-TPC fabrication update (Daniel) 
-  -ANL analysis update (Tan) 
-  -Cf source measurements (Cathleen, Guillaume) 
- 
-**Tuesday, June 25, 2013** 
-  * Agenda 
-  -Neural network work (Josh) 
-  -10Be analysis (Adam) 
-  -CoBo testing (Faisal) 
-  -3-body decay charge deposit calculations (Guillaume) 
- 
-**Tuesday, June 18, 2013** 
-  * Agenda 
-  -Introduction of 3 new students (Daniel) 
-  -Field cage development update (Daniel) 
-  -Summer experiment at Notre Dame (Saul) 
-  -Laser testing results with test chamber (Maxime) 
-  -Alpha range calculation for 12C 3-alpha decay (Guillaume) 
-  -CoBo firmware update (Faisal) 
-  -Multiplicy trigger update (Nathan) 
-  -Measurements with fission source (Wolfi) 
- 
-**Tuesday, May 28, 2013** 
-  * Agenda 
-  -Field cage development update (Daniel) 
-  -Solenoid cooling update (Daniel) 
-  -Laser testing results with test chamber (Saul) 
-  -Diffusion calculation for 12B experiment (Maxime) 
-  -Alpha range calculation for 12C 3-alpha decay (Guillaume) 
-  -CoBo firmware update (Nathan) 
- 
-**Tuesday, May 21, 2013** 
-  * Agenda 
-  -Status of LHe fill of Solenoid (Daniel) 
-  -CoBo testing update (Faisal) 
-  -12C 3-body decay simulation (Wolfi) 
-  -Laser testing started (Saul) 
- 
-**Tuesday, May 14, 2013** 
-  * Agenda 
-  -m-CoBo update, DDR2 memory, Flash, etc. test (Faisal) 
-  -ANL analysis update (Tan) 
-  -AT-TPC fabrication update (Daniel) 
-  -Transfer LN2 to LN2 shield from He vessel (Daniel) 
- 
-**Tuesday, May 7, 2013** 
-  * Agenda 
-  -Solenoid cooling status (Daniel) 
-  -Laser safety review and future test plans (Saul) 
-  -CoBo testing update (Daniel) 
- 
-**Tuesday, April 30, 2013** 
-  * Agenda 
-  -CoBo shipping update (Daniel) 
-  -10Be analysis update (Adam) 
-  -Solenoid cooling started (Daniel) 
-  -ANL upcoming experiment update (Tan) 
-  -Work started on UV laser (Wolfi) 
- 
-**Tuesday, April 23, 2013** 
-  * Agenda 
-  -Field cage update (Daniel) 
-  -Experiment plans, ANL, Notre Dame 
-  -Diode protection circuit discussion 
-  -Update on time differences for ANL data (Tan) 
- 
-**Tuesday, April 16, 2013** 
-  * Agenda 
-  -Field cage measurements (Daniel) 
-  -ANL data sorting (Tan) 
-  -CoBo Power (Faisal) 
- 
-**Tuesday, April 9, 2013** 
-  * Agenda 
-  -Field cage cleaned (Daniel) 
-  -ANL experiment magnetic field considerations 
-  -plan to cool solenoid (Daniel) 
-  -firmware adapting to full CoBo (Faisal) 
-  -CoBo clock architecture (Faisal) 
- 
-**Tuesday, April 2, 2013** 
-  * Agenda 
-  -124Sn Argonne test run update (Daniel) 
-  -Field cage machined and received 
-  -CoBo v.0.2 memory (Faisal) 
-  -Gas handling update (Zach M) 
- 
-**Tuesday, March 12, 2013** 
-  * Agenda 
-  -10Be data analysis update (Adam) 
-  -ANL experiment details (Tan) 
-  -progress on multiplicity trigger (Nathan, Tan) 
- 
-**Tuesday, March 5, 2013** 
-  * Agenda 
-  -ANL experiment details (Tan) 
-  -discussion on multiplicity trigger, sparking limit for Sn beams at ANL 
-  -CoBo design update (Faisal) 
-  -AsAd's ordered (Daniel) 
-  -Discussion of card shielding 
- 
-**Tuesday, February 26, 2013** 
-  * Agenda 
-  -ANL experiment scheduled (Tan) 
-  -Multiplicity trigger discussion 
-  -CoBo progress (Faisal) 
- 
-**Tuesday, January 22, 2013** 
-  * Agenda 
-  -AT-TPC Project Timeline (Daniel) 
-  -Notre Dame experiment prep 
-  -CoBo memory debugging (Faisal) 
- 
-**Tuesday, January 15, 2013** 
-  * Agenda 
-  -CoBo work, VxWorks image generation (Faisal, Shelbi, Patrick) 
-  -Discussion of mesh signals for fission fragments 
- 
-**Tuesday, January 8, 2013** 
-  * Agenda 
-  -New Micromegas update 
-  -Notre Dame experiment scheduled 
- 
-**Tuesday, December 11, 2012** 
-  * Agenda 
-  -Field cage received (Daniel) 
-  -Drawings submitted to shop 
-  -Cobo development update (Faisal) 
-  -Prototype Micromegas design update (Saul) 
- 
-**Tuesday, December 4, 2012** 
-  * Agenda 
-  -GET controller and Micromegas testing (Tan, Ian) 
-  -Micromegas design update (Faisal) 
- 
-**Tuesday, November 27, 2012** 
-  * Agenda 
-  -AT-TPC event generator (Daniel) 
-  -GET software update (Tan, Nathan) 
-  -Prototype Micromegas pad design (Saul) 
-  -Cobo Gigabit ethernet (Faisal) 
- 
-**Tuesday, November 20, 2012** 
-  * Agenda 
-  -Detector drawing almost approved (Daniel) 
-  -Prototype Micromegas Pad design (Saul) 
-  -CoBo Gigabit work (Faisal) 
- 
-**Tuesday, November 13, 2012** 
-  * Agenda 
-  -AT-TPC cart design (Daniel) 
-  -GET Controller software updated (Nathan) 
- 
-**Tuesday, November 8, 2012** 
-  * Agenda 
-  -Plans to order AGET chips (Daniel) 
-  -GET debugging (Nathan) 
- 
-**Tuesday, October 30, 2012** 
-  * Agenda 
-  -AT-TPC fabrication progress (Daniel) 
-  -Gas handling update (Zach) 
- 
-**Tuesday, October 23, 2012** 
-  * Agenda 
- 
-**Tuesday, October 16, 2012** 
-  * Agenda 
- 
-**Tuesday, October 9, 2012** 
-  * Agenda 
-   -AT-TPC design approval in process (Daniel) 
-   -Saclay AsAd 1.1 test after repair (Tan) 
-   -CoBo firmware updated for use with multiple reduced CoBo's (Nathan) 
-   -MCP testing setup (Adam) 
- 
-**Tuesday, October 2, 2012** 
-  * Agenda 
-   -Fixed regulator for Saclay AsAd 1.1 (Tan) 
-   -Agiltron test (Saul) 
-   -Reduced CoBo update (Nathan) 
-   -Micromegas PCB update (Faisal) 
-   -8Be kinematics (Aimee) 
- 
-**Tuesday, September 25, 2012** 
-  * Agenda 
-   -Comparison of Daisuke's analysis of 6He elastic scattering data (Aimee) 
-   -Saclay AsAd 1.1 testing (Tan, Aimee, Nathan) 
-   -CoBo firmware for ethernet frames update (Nathan) 
-   -CoBo processor status (Faisal) 
- 
-**Tuesday, September 18, 2012** 
-  * Agenda 
-   -Field cage fabrication started (Daniel) 
-   -Hit pattern and thresholds test for GET (Tan, Aimee) 
-   -New pump and compressor update (Zach) 
-   -MCP testing setup (Adam) 
-   -Pad design (Faisal) 
- 
-**Tuesday, September 11, 2012** 
-  * Agenda 
-   -AT-TPC source arm design update (Daniel) 
-   -Test chamber data, micromegas troubleshooting (Tan, Aimee) 
-   -CoBo update and micromegas pad design (Faisal) 
- 
-**Tuesday, September 4, 2012** 
-  * Agenda 
-   -GET electronics, testing saturation problem (Tan, Aimee) 
-   -Gas handling, compressor and pump update (Zach) 
-   -10Be analysis (Adam) 
-   -Pad design implementation status (Faisal) 
- 
-**Tuesday, August 28, 2012** 
-  * Agenda 
-   -AT-TPC magnet yoke assembled and put in place (Daniel) 
-   -AT-TPC design updates, Gas flow tube size for flow rate (Daniel) 
-   -Ring cutter design (Daniel) 
-   -GET multiplicity measurements (Tan, Aimee) 
- 
-**Tuesday, August 14, 2012** 
-  * Agenda 
-   -GET testing update (Tan, Aimee) 
-   -10Be analysis (Adam) 
-   -Field cage ring construction (Ian, Wolfi) 
-   -CoBo update (Faisal) 
- 
-**Tuesday, August 7, 2012** 
-  * Agenda 
-   -Fission source measurements (Remi, Malek, Tan) 
-   -GET software problems 
-   -Pad plane design, research on laser, AT-TPC Mechanical Design Review (Saul) 
-   -10Be + alpha data analysis update (Adam) 
-   -CoBo, DDR memory testing (Faisal) 
- 
-**Tuesday, July 31, 2012** 
-  * Agenda 
-   -Problems and progress on fission source measurement in test chamber (Remi, Malek, Tan) 
-   -CoBo update (Faisal) 
- 
-**Tuesday, July 24, 2012** 
-  * Agenda 
-   -Micromegas pad pattern with fine pitch area (Saul) 
-   -8Be statistics update (Aimee) 
-   -Tiled micromegas data taking and mapping (Remi, Malek, Tan) 
-   -GET electronics testing (Wolfi, Tan) 
-   -CoBo testing/ZAP update (Faisal) 
- 
-**Tuesday, July 17, 2012** 
-  * Agenda 
-   -More data taken for tiled resitive micromegas (Malek, Remi, Tan) 
-   -Gas tube progress (Ian) 
-   -Prototype CoBo boards received (Faisal) 
- 
-**Tuesday, July 10, 2012** 
-  * Agenda 
-   -Tiled micromegas measurements (Malek, Remi, Tan) 
-   -10Be angle measurements (Adam) 
-   -CoBo and ZAP update (Faisal) 
- 
-**Tuesday, July 3, 2012** 
-  * Agenda 
-   -Considerations for ZAP/AsAd mounting, shielding, cooling 
-   -GET electronics testing started (Tan, Faisal) 
-   -Micromegas pad design considerations (Saul) 
-   -Allene test results (Malek, Remi) 
- 
-**Tuesday, June 26, 2012** 
-  * Agenda 
-   -Endplate design details (Daniel) 
-   -10Be + 6He analysis (Adam) 
-   -Gas handling parts ordered (Zach) 
-   -Plan for gas tubes for Prototype (Ian) 
-   -GET software installation and testing plans (Tan, Daniel) 
-   -Pad simulation update (Saul) 
- 
-**Tuesday, June 19, 2012** 
-  * Agenda 
-   -Allene measurements (Malek, Remi) 
-   -8,9Be analysis (Aimee) 
-   -MCP housing modifications (Adam) 
-   -CoBo update (Faisal) 
- 
-**Tuesday, June 12, 2012** 
-  * Agenda 
-   -Pad geometry simulation (Saul) 
-   -GET software update (Nathan) 
-   -CoBo and ZAP update (Faisal) 
- 
-**Tuesday, June 5, 2012** 
-  * Agenda 
-   -Allene testing (Malek, Remi, Tan) 
-   -Micromegas pad simulation results (Saul) 
-   -Be analysis (Aimee) 
-   -ZAP design (Faisal) 
- 
-**Tuesday, May 29, 2012** 
-  * Agenda 
-   -End plate developments (Daniel) 
-   -Gas mixture (Ar-H2) measurements (Malek, Remi, Tan) 
-   -Be fusion analysis (Aimee) 
-   -ZAP design (Faisal) 
- 
-**Tuesday, May 22, 2012** 
-  * Agenda 
-   -End plate prototype (Daniel) 
-   -Physics discussion meetings to start 
- 
-**Thursday, May 10, 2012** 
-  * Agenda 
-   -Solenoid enclosure and magnetic field considerations (Daniel) 
-   -ZAP design considerations (Daniel) 
-   -GET raw data unpacking (Tan) 
-   -CoBo quotes (Faisal) 
-   -Agiltron micromegas testing (Saul, Wolfi) 
- 
-**Thursday, May 3, 2012** 
-  * Agenda 
-   -ATTPC final design almost ready. HV was ordered this morning. (Daniel) 
-   -Gas handling system (Zach) 
-   -Test with micromegas from Agiltron (Wolfi) 
-   -Conditioning of micromegas, simulation progress (Saul) 
-   -Board designed about to be submitted (Faisal) 
-   -9Be and 8Be (Aimee) 
-   -Repairing MCP housing, root code (Adam) 
- 
-**Thursday, April 25, 2012** 
-  * Agenda 
-   -GET software fully compiled in MAC (Nathan is fixing some bugs)  (Daniel) 
-   -Gas handling system (Zach/John) 
-   -Shielding of the solenoid (Wolfi) 
-   -Conditioning of micromegas (Saul) 
-   -SBIR will send commercial micromegas to test (Wolfi) 
-   -9Be and 8Be (Aimee) 
-   -Repairing MCP housing (Adam) 
- 
- 
-**Thursday, April 19, 2012** 
-  * Agenda 
-   -Power supply quote (Daniel) 
-   -Conditioning of micromegas (Tan and Saul) 
-   -Mapping on the way while waiting for the connectors to arrive (Daniel and Ian) 
-   -Mechanical design almost ready. Working in a transportation cart for the detector (Daniel) 
-   -9Be and 8Be (Aimee) 
-   -Simulation in progress (Saul) 
-   -Dineutron FRESCO simulation (Adam) 
- 
-**Thursday, April 12, 2012** 
-  * Agenda 
-   -AGET, AsAd update and plans for testing (Nathan) 
-   -Proposal for fission studies with Prototype (Bill) 
- 
-**Thursday, April 5, 2012** 
-  * Agenda 
-   -AsAd pinout (Nathan) 
-   -Plans for conditioning micromegas and test electronics 
-   -Discussion on programmable ZAP 
-   -Magnet yoke, fringe field calculations underway (Daniel) 
-   -Search for 8Be (Aimee) 
- 
-**Thursday, March 29, 2012** 
-  * Agenda 
-   -Power supply quotes (Daniel) 
-   -Search for 9Be (Aimee) 
-   -Discussion on amplifiers and linear circuits 
-   -Gas handling system update (Zach) 
-   -COBO update (Faisal) 
- 
-**Thursday, March 23, 2012** 
-  * Agenda 
-   -AT-TPC flange design (Daniel) 
-   -AGET testing and COBO progress (Nathan, Faisal) 
-   -Micromegas pad design considerations (Saul) 
- 
-**Thursday, March 1, 2012** 
-  * Agenda 
-   - Solenoid field calculations (Daniel) 
-   - ND experiment Prep 
-   - AGET testing update (Nathan)  
- 
-**Thursday, February 23, 2012** 
-  * Agenda 
-   - Samurai TPC pad plane (Jon Barney) 
-   - AT-TPC flange design (Daniel) 
-   - Allene test results (Tan) 
-   - 6He data analysis (Aimee) 
-   - ND experiment trigger (Wolfi) 
- 
-**Thursday, February 16, 2012** 
-  * Agenda 
-   - Prep for ND experiment 
-   - Ar + H2 tests (Tan, Saul) 
-   - COBO DDR update (Faisal) 
- 
-**Wednesday, February 8, 2012** 
-  * Agenda 
-   - Prep Issues for ND experiment, adapter piece for MCP/Prototype (Adam, Tan) 
-   - COBO update (Faisal) 
-   - Gas Handling update (Zach) 
- 
-**Thursday, February 3, 2012** 
-  * Agenda 
-   - Update from Bob Flight on AT-TPC design (Daniel) 
-   - Adaptor Board status (Tan, Ian) 
-   - AGET testing update (Nathan) 
-   - Gas Handling update, discussion of need for recirculation and gas chromatagraph (Zach, John) 
- 
-**Thursday, January 26, 2012** 
-  * Agenda 
-   - NIM signal to T2K test (Tan) 
-   - Resistive Micromegas Adapter board (Ian) 
-   - COBO, crate setup (Faisal) 
-   - Gas handling system update (Zach) 
- 
-**Thursday, January 19, 2012** 
-  * Agenda 
-   - Ar + H2 mixture test results (Wolfi, Tan, Ian) 
-   - Notre Dame experiment scheduling and needs 
-   - AGET testing to be planned (Nathan) 
-   - COBO update, issues with DDR memory (Faisal) 
-   - Gas handling system requirements (John) 
-   - ND date analysis (Adam, Aimee) 
- 
-**Thursday, January 12, 2012** 
-  * Agenda 
-   - Test of resistive micromegas, Adapter board (Tan, Ian) 
-   - Plan for Ar+H test (Wolfi, Tan, Ian) 
-   - some thoughts about ND experiment trigger 
-   - Gas handling system update (Zach) 
-   - Micromegas pad design 
- 
-**Thursday, January 5, 2012** 
-  * Agenda 
-    - AT-TPC Design update, chamber shortened (Daniel) 
-    - Resistive Micromegas Adapter board (Ian) 
-    - AGET testing (Nathan) 
-    - COBO update (Faisal) 
-    - Allene info (Tan) 
- 
-**Thursday, December 22, 2011** 
-  * Agenda 
-    - AT-TPC Design update 
-    - COBO, change from 3 to 1 data format (Nathan) 
- 
-**Thursday, December 15, 2011** 
-  * Agenda 
-    - Resistive Micromegas, possibilities for capacitance measurement 
-    - Plan to test different gas mixtures (Ar+H, allene), (Ian) 
-    - Design of resistive Micromegas adapter board (Ian) 
- 
-**Thursday, December 8, 2011** 
-  * Agenda 
-   - Resistive Micromegas Simulations (Wolfi) 
-   - GET meeting: GET board presented (Faisal) 
-   - need to test logic in chip 
-   - hit pattern recognition possible? 
- 
-**Thursday, November 3, 2011** 
-  * Agenda 
-    - ND experiment in October (DS) 
-    - GET (Nathan) 
- 
-**Thursday, September 15, 2011** 
-  * Agenda 
-    - CoBo (Nathan) 
-    - ND experiment in October (DS) 
-    - MCP (Adam/Wes) 
- 
-**Thursday, September 08, 2011** 
-  * Agenda 
-    - ND experiment in October (DS) 
-    - Design effort/ Gas handling (Daniel) 
-    - ND visit & MCP (Adam/Wes) 
-    - GET (Nathan) 
-    - Testing of Micromegas with pulser(Wolfi) 
- 
-**Thursday, September 01, 2011** 
-  * Agenda 
-    - Test chamber with ZAP/ ND experiment in October (DS) 
-    - PCB for MCP (Adam/Wes) 
-    - CoBo (Nathan) 
-    
-**Thursday, August 25, 2011** 
- 
-**Thursday, August 11, 2011** 
-  * Agenda 
-    - Test chamber with ZAP (DS) 
-    - CoBo (Nathan) 
-    - Analysis of ND fusion data (Aimee) 
-    - Gas handling system (John) 
- 
-**Thursday, August 4, 2011** 
-  * Agenda 
-    - Analysis of ND data (DS) 
-    - CoBo (Nathan) 
-    - Analysis of ND fusion data (Aimee) 
- 
-**Thursday, July 28, 2011** 
-  * Agenda 
-    - Range analysis for hydrogen (Fred) 
-    - Correlation between pads of Micromegas (Fabien) 
-    - New AsAd board (Nathan) 
-    - MCP (Adam) 
-    - Resistive Micromegas (Wolfi) 
- 
-**Thursday, July 21, 2011** 
-  * Agenda 
-    - ReA3 layout (Fernando) 
-    - Delay line (Adam/Aimee) 
-    - Resistive Micromegas (Wolfi) 
-    - Range analysis for hydrogen (Fred) 
-    - Correlation between pads of Micromegas (Fabien) 
-    - Gas handling system (John) 
-    - Spring connector (Bill) 
-    - ZAP/Micromegas for Prototype (Wes) 
- 
-**Thursday, July 14, 2011** 
-  * Agenda 
-    - ReA3 layout (Fernando) 
-    - Samurai TPC (Rebecca)  
-    - CoBo (Nathan/Faisal) 
-    - Gas handling system (John) 
-    - Correlation between pads of Micromegas (Fabien/Fred) 
- 
-**Thursday, July 7, 2011** 
-  * Agenda 
-    - CoBo (Nathan/Faisal) 
-    - Narval (Eugene) 
-    - Delay line for the MCP (Adam/Aimee) 
-    - Analysis of the hydrogen data / Pad response (Fabien/Fred) 
- 
-**Thursday, June 30, 2011** 
-  * Agenda 
-    - Test of hydrogen (Dany) 
-    - Analysis of the hydrogen data (Fabien) 
-    - Simulation of the pad responses (Fred) 
-    - Narval (Eugene/Fred) 
-    - CoBo (Nathan/Faisal/Gilles) 
-    - Delay line for the MCP (Adam) 
-    - Resistive Micromegas (Aimee) 
- 
-**Thursday, June 23, 2011** 
-  * Agenda 
-    - CoBo/AsAd (Nathan) 
-    - uTCA (Faisal) 
-    - ND analysis (DS) 
-    - Hydrogen test (Dany) 
-    - Charge division (Aimee) 
-    - Analysis of H2 data (Fred/Fabien)  
- 
-**Thursday, June 16, 2011** 
-  * Agenda 
-    - ND beam monitor / ND analysis (DS) 
-    - Hydrogen test (Dany) 
-    - Reaction calculation (Adam) 
-    - CoBo status (Nathan) 
-    - Design of the AT-TPC (Daniel)  
- 
-**Thursday, June 9, 2011** 
-  * Agenda 
-    - ND beam development (DS) 
-    - P10 test (Eugene) 
-    - MCP (Adam, Aimee) 
-    - CoBo status (Nathan)  
- 
-**Thursday, June 2, 2011** 
-  * Agenda 
-    - Test of hydrogen/P10 (Dany) 
-    - He+Isobutane/ ND beam development (DS) 
-    - MCP (Adam, Aimee) 
-    - CoBo status (Faisal)  
- 
-**Thursday, May 26, 2011** 
-  * Agenda 
-    - Preparation for ND fall/ He+Isobutane (DS) 
-    - MCP (Adam, Aimee) 
-    - AsAd status (Nathan)  
-    - CoBo status (Faisal)  
- 
-**Thursday, May 19, 2011** 
-  * Agenda 
-    - Test of hydrogen gas (Eugene, Dany)  
-    - Analysis of the Notre Dame data (DS) 
-    - MCP (Adam, Aimee) 
-    - AsAd status (Nathan)  
-    - CoBo status (Faisal)  
-    - Gas handling system test (John)  
- 
-**Thursday, May 12, 2011** 
-  * Agenda 
-    - Analysis of the Notre Dame data (DS) 
-    - Test of hydrogen gas (Eugene, Dany)  
-    - Resistive Micromegas (Wolfi)  
-    - MCP (Adam, Aimee) 
-    - AsAd status (Nathan)  
- 
-**Thursday, May 5, 2011** 
-  
-**Thursday, April 28, 2011** 
-   * Agenda 
-     - Commissioning at Notre Dame(DS) 
- 
- 
-**Thursday, March 17, 2011** 
-   * Agenda 
-     - Schedule of transport(DS) 
-     - Upgraded T2K (Eugene)  
-     - Reduced CObo (Nathan) 
-     - MCP(Adam) 
- 
-**Thursday, March 10, 2011** 
-   * Agenda 
-     - Visit to ND (DS) 
-     - Upgraded T2K (Eugene)  
-     - Stay at Saclay (Nathan) 
-     - MCP(Adam) 
- 
-**Thursday, March 3, 2011** 
-   * Agenda 
-     - Analysis of the wire plane (Lu)      
-     - Prototype AT-TPC (DS) 
-     - Upgraded T2K (Eugene)  
-     - GET (Faisal) 
-     - Power Supply (Daniel) 
- 
-**Thursday, February 24, 2011** 
-   * Agenda 
-     - Prototype AT-TPC: Uniformity, time dependence (DS) 
-     - Power supply for GET (Eugene)  
-     - MCP & beam window foil (Adam) 
-     - Visit to Saclay (Nathan) 
-     - Gas handling system (John) 
- 
-**Thursday, February 17, 2011** 
-   * Agenda 
-     - ZAP (Mike) 
-     - Trigger (Wolfi)  
-     - MCP (Adam) 
-     - Matsusada Power Supply (Daniel) 
- 
-**Thursday, February 10, 2011** 
-   * Agenda 
-     - The beam line ladder (Mike) 
-     - Gas handler (John) 
-     - The Prototype AT-TPC (DS) 
-     - Reduced Cobo (Nathan) 
-     - Upgraded T2K and its support(Eugene) 
-     - Cross talk of the PCB (Bill) 
-     - Preliminary Project Plan (Daniel) 
- 
-**Thursday, February 3, 2011** 
-   * Agenda 
-     - The Prototype AT-TPC (DS) 
-     - Upgraded T2K, grounding of the GET (Eugene) 
-     - micro TCA (Faisal, Nathan) 
-     - Gas handler (John) 
- 
-**Thursday, January 27, 2011** 
-   * Agenda 
-     - Designing of the AT-TPC (Marius) 
-     - The Prototype AT-TPC (DS) 
-     - Upgraded T2K, grounding of the GET (Eugene) 
- 
-**Friday, January 14, 2011** 
-   * Agenda 
-     - The Prototype AT-TPC (DS) 
-     - Designing of the AT-TPC (Marius) 
-     - Designing of the ZAP (Mike) 
-     - Status of the Prototype GET (Nathan) 
- 
- 
-**Thursday, January 6, 2011** 
-   * Agenda 
-     - The DAQ, the new T2K (Eugene) 
-     - The Prototype AT-TPC (DS) 
-     - Designing of the AT-TPC (Marius) 
-     - Development of the gas handler (John) 
-     - Micro TCA (Faisal) 
-     - Status of the Prototype GET (Nathan) 
- 
-**Thursday, December 30, 2010** 
- 
-**Thursday, December 16, 2010** 
-   * Agenda 
-     - Update of the Prototype AT-TPC (DS/Eugene) 
-     - Commissioning at ND (DS) 
-     - New T2K (Eugene) 
-     - Status of the stay of Nathan in Bordeaux (Daniel/Faisal) 
- 
-**Thursday, December 9, 2010** 
-   * Agenda 
-     - Update of the Prototype AT-TPC (DS) 
-     - DAQ system for the GET (Eugene) 
-     - Reduced CoBo update (Faisal) 
- 
-**Thursday, December 2, 2010** 
-   * Agenda 
-     - Update of the Prototype AT-TPC (DS) 
-     - Reduced CoBo update (Nathan) 
- 
-**Thursday, November 18, 2010** 
-   * Agenda 
-     - Update of the Prototype AT-TPC (DS) 
-     - Design of the AT-TPC (Marius) 
-     - Reduced CoBo update (Nathan) 
- 
-**Thursday, November 11, 2010** 
-   * Agenda 
-     - Commissioning at ND (DS) 
-     - Reduced CoBo update (Nathan) 
- 
-**Thursday, November 4, 2010** 
-   * Agenda 
-     - Update of testing of the Prototype AT-TPC (DS) 
-     - Reduced CoBo update (Nathan) 
-     - Design of the Field Cage (Jon) 
- 
-**Thursday, October 28, 2010** 
-   * Agenda 
-     - The cathode power supply issue (DS) 
-     - Conditioning of the Micromegas (Mike) 
-     - Reduced CoBo update (Nathan) 
-     - Testing of the CO2 trap (John/Mike) 
-     - Design of the Field Cage (Jon) 
- 
-**Thursday, October 21, 2010** 
-   * Agenda 
-     - Testing of the CO2 trap (Mike) 
-     - The control software of power supplies (Eugene) 
-     - Assembly of the Prototype AT-TPC (DS/Mike) 
- 
-**Friday, October 15, 2010** 
-   * Agenda 
-     - Report on the visit of CEA-Saclay (Nathan/Eugene) 
- 
-**Thursday, October 7, 2010** 
-   * Agenda 
-     - Assembly of the Prototype AT-TPC (DS) 
- 
-**Thursday, September 30, 2010** 
-   * Agenda 
-     - Micromegas fabrication at Saclay (Mike/Bill) 
-     - Progress on assembly of prototype detector (Daisuke) 
- 
-**Thursday, September 23, 2010** 
-   * Agenda 
-     - Cable & remote control of high voltage power supply (Eugene) 
-     - Status of fabrication of Micromegas (Daisuke) 
-     - Status of hydrogen/deuterium safety (Daisuke) 
-     - Status of assembly of Prototype AT-TPC (John/Jon/Daisuke) 
-     - Status of testing of the CO2 trap (John) 
-     - Reduced CoBo/Prototype GET plan (Nathan) 
- 
-**Thursday, September 16, 2010** 
- 
-**Thursday, September 9, 2010** 
- 
-**Thursday, September 2, 2010** 
- 
-**Thursday, August 26, 2010** 
-   * Agenda 
-     - Progress on prototype fabrication and assembly (Mike) 
-     - Cathode voltage feedthru for the AT-TPC (Eugene) 
-     - Progress on wire plane tests (Daisuke) 
- 
-**Thursday, August 12, 2010** 
- 
-**Thursday, August 5, 2010** 
-   * Agenda 
-     - GET status (Nathan) 
-     - Laser calibration system (Justin/Mike) 
-     - Gas handling system for the Prototype (DS) 
- 
-**Thursday, July 29, 2010** 
-   * Agenda 
-     - Design of the AT-TPC (Harry) 
-     - The status of the analysis of the Micromegas test (Anthony) 
- 
-**Thursday, July 22, 2010** 
-   * Agenda 
-     - Review of the gas handling system of the AT-TPC (John/Ana) 
-     - GET power supply / Remote control system (Eugene) 
- 
-**Thursday, July 15, 2010** 
-   * Agenda 
-     - Status of testing of Micromegas (Anthony/Claire) 
-     - Status of MCP design (Justin) 
-     - Misc. information (DS) 
- 
-**Thursday, July 8, 2010** 
-   * Agenda 
-     - Status of the design of the Prototype (Daisuke) 
-     - Status of the new test room (Bill) 
-     - Multi-pin connector connection test kit with LED (Mike) 
-     - Laser & X-Y table (Mike/Justin) 
-     - Misc (Hydrogen gas, Gas handling system review, Power supply) 
- 
-**Thursday, July 1, 2010** 
- 
-**Thursday, June 24, 2010** 
-   * Agenda 
-     - review released drawing for the prototype from B. Flight, before sending to J. Ottarson for final design review (Daisuke) 
-     - progress on testing of gas mixtures and energy resolution (Claire) 
-     - suggestions for organization of test area (Bill) 
-     - Announcements (Daniel) 
- 
-**Thursday, June 17, 2010** 
-   * Agenda 
-     - Update of the design of the AT-TPC (Harry) 
-     - Status of the test of Micromegas (Claire/Justin/Anthony){{:wm_6-17-2010.pptx| Slides}} 
- 
-**Thursday, June 10, 2010** 
-   * Agenda 
-     - Update of the design of the Prototype AT-TPC (DS) 
- 
-**Thursday, June 3, 2010** 
-   * Agenda 
-     - Status of move to new testing area and test setup (Daisuke){{:wm_6-03-2010_ds.pptx| Slides}} 
-     - Discussion of milestone dates for prototype (Daisuke/Daniel) 
-     - Status of CoBo development (and other DAQ components?) (Nathan) 
- 
-**Thursday, May 27, 2010** 
-   * Agenda 
-     - New test area organization and progress (Daisuke) 
-     - Tests of micromegas - resolution with alpha source (Claire){{:wm_5-27-2010.pptx| Slides}} 
-     - Preparation of issues to discuss with Bob Flight at next meeting this coming Friday 
-     - Breakdown of AT-TPC project in sub-projects (Daniel) 
- 
-**Thursday, May 20, 2010** 
-   * Agenda 
-     - New test room update 
-     - Testing of Micromegas; reduction of negative cross talk {{:wm_5-20-2010.pptx| Slides}} 
-     - ANSYS for studying mechanical characteristics of the AT-TPC 
-     - Design of Prototype AT-TPC at Rochester 
- 
-**Thursday, May 13, 2010** 
-   * Agenda 
-     - Testing of micromegas in test chamber {{:wm_5-13-2010_ds.pptx| Slides}} 
-     - Status of clean room and its infrastructure 
-     - Status of connector board prototype 
-     - Prototype design at Rochester / organization of follow-up weekly meetings 
-     - Possibility of collaboration with Lawrence Livermore National Laboratory 
- 
-**Thursday, May 6, 2010** 
-   * Agenda 
-     - Status of clean room and schedule of move to new testing/assembly area {{:wm_5-06-2010_ds.pptx| Slides}} 
-     - Micromegas tests: status and issues 
-     - Discussion about a laser calibration system {{:wm_5-06-2010_hm_lasercalibration.pptx| Slides}} 
-     - Gas handling system design status (feedback on work order, path forward) 
- 
-**Thursday, April 29, 2010** 
-   * Agenda 
-     - Status of clean room (Daisuke){{:wm_4-29-2010_ds.pptx| Slides}} 
-     - Test of micromegas with new connectors (Mike/Daisuke) 
-     - Concept drawing for TPC angle mechanism (Harry) 
- 
- 
-**Thursday, April 22, 2010** 
-   * Agenda 
-     - Design of prototype in Rochester (Daisuke) 
-     - Gas handling system design (Fernando/Ana) 
-     - Clean room construction (Daniel/Daisuke) 
-     - Connector assembly prototype (Mike) 
-     - Discussion about items that should be procured ASAP (Bill) 
-     - Miscellaneous 
- 
-**Thursday, April 15, 2010** 
- 
- 
-**Thursday, April 8, 2010** 
-  * {{:wm_4-08-2010_minute.docx|Minute}} 
-  * Agenda 
-    - The status of the CoBo (NU) [[https://project-actar-get.cea.fr/Groups/100_todolist/400_wp4_data_acquisi/slides_-_presentatio/workgroup_contents| Slides]] 
-    - The individual bias circuit and the insertion test kit of the Micromegas (MF) 
- 
-**Thursday, April 1, 2010** 
-  * {{:wm_4-01-2010_minute.docx|Minute}} 
-  * Agenda 
-    - Micromegas design submission (MF) {{:wm_4-01-2010_mf_micromegas.pptx| Slides}}  
-    - Test field cage (WM) 
-    - Status of the project management (DS) {{:wm_4-01-2010_ds.pptx| Slides}} 
-    - Forthcoming events (WM) 
- 
- 
-**Thursday, March 25, 2010** 
-  * {{:wm_3-25-2010_minute.docx|Minute}} 
-  * Agenda 
-    - Capacitance measurement of Micromegas (MF) {{:wm_3-25-2010_micromegas_capa_mf.pptx| Slides}} 
-    - Status of the Prototype design (WM/DS)  
- 
-**Thursday, March 18, 2010** 
- 
-  * {{:wm_3-18-2010_minute.docx|Minute}} 
-  * Agenda 
-    - Electric field simulation (FM) {{:wm_3-18-2010_fm_garfield.ps| Simulation result}} 
-    - Filed cage design (DS) {{:wm_3-18-2010_dsx.pdf| Slides}} 
-    - ZAP design (WL)  [[https://project-actar-get.cea.fr/Groups/100_todolist/200_wp2_front_end_el/zap/slides-presentation/protection_unit_pres6362/view| ZAP circuit design]]     {{:zap_integration_at-tpc_2010-3-15_x.pdf|ZAP integration}}  
-    - Micromegas capacitance (WM) 
-    - Purchasing of a scroll pump (FM/DS) 