venting_pumping_object_box [2024/02/06 09:35] noji |
venting_pumping_object_box [2025/12/01 12:37] (current) pereira [Vent Object chamber] |
||
|---|---|---|---|
| Line 1: | Line 1: | ||
| ====== Venting/ | ====== Venting/ | ||
| - | ===== Vent Object chamber ===== | + | In CS-Studio/ |
| - | + | ||
| - | From the S800 Main Vacuum page, go to the Object chamber page, opening the page shown in the figure | + | |
| {{: | {{: | ||
| - | The vent valve should | + | ===== Vent Object chamber ===== |
| - | * The beamline gate valves D2341 BGV and D2303 BGV are closed | + | |
| - | * The IG is off | + | The vent valve and the roughing valve RV should be closed when you begin. |
| - | * The roughing valve RV is closed. | + | |
| - | * The turbo pump gate valve TVG is closed. If the chamber will be vented for a long time, the turbo pump should be switched off . | + | |
| The venting procedure is as follows: | The venting procedure is as follows: | ||
| + | - Notify the Control Room and Vacuum Group and inform them that they can disregard the EXP alarm that will occur | ||
| + | - Make sure that the detectors inside the chamber have been unbiased | ||
| + | - Close the beamline gate valves D2341 BGV and D2303 BGV | ||
| + | - Turn off the IG | ||
| + | - Close the turbo pump gate valve TVG. If the chamber will be vented for a long time, the turbo pump should be switched off | ||
| - Monitor the pressure RBT_BTS31: | - Monitor the pressure RBT_BTS31: | ||
| - Open the vent valve | - Open the vent valve | ||