User Tools

Site Tools


venting_pumping_object_box

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
venting_pumping_object_box [2024/02/06 10:40]
noji
venting_pumping_object_box [2025/12/01 12:37] (current)
pereira [Vent Object chamber]
Line 10: Line 10:
  
 The venting procedure is as follows:  The venting procedure is as follows: 
-  - Notify the Control Room and inform them that they can disregard the EXP alarm that will occur+  - Notify the Control Room and Vacuum Group and inform them that they can disregard the EXP alarm that will occur
   - Make sure that the detectors inside the chamber have been unbiased   - Make sure that the detectors inside the chamber have been unbiased
   - Close the beamline gate valves D2341 BGV and D2303 BGV   - Close the beamline gate valves D2341 BGV and D2303 BGV
venting_pumping_object_box.txt ยท Last modified: 2025/12/01 12:37 by pereira