Line 48: | Line 48: | ||
The PPAC pressure S800_GHS: | The PPAC pressure S800_GHS: | ||
RBT_BTS32: | RBT_BTS32: | ||
- | ===== Evacuating | + | ===== Pumping down the Chamber ===== |
Ensure | Ensure | ||
Line 69: | Line 69: | ||
- Be sure to go back to S3 and close the manual valve. | - Be sure to go back to S3 and close the manual valve. | ||
===== Filling and Running Detectors ===== | ===== Filling and Running Detectors ===== | ||
- | - If in Vent Mode, click **PUMP** then click **RUN** to enter Run Mode. | + | - If in Vent Mode, click **PUMP** then click **RUN** to enter Run Mode. The valves #1 opens and #3 remains open (#5 and #6 will be closed, and the GHS lines will be isolated from the chamber). |
- If in Pump Mode, click **RUN** to enter Run Mode. | - If in Pump Mode, click **RUN** to enter Run Mode. | ||
- Plot and monitor IG_D2430: | - Plot and monitor IG_D2430: |