to-do_list [2017/06/16 19:08] pereira [In data U6] |
to-do_list [2023/10/19 17:15] (current) swartzj |
||
---|---|---|---|
Line 7: | Line 7: | ||
* [[Installation FP SCI|Install the focal-plane scintillator]] with the right thickness (1mm or 5mm) | * [[Installation FP SCI|Install the focal-plane scintillator]] with the right thickness (1mm or 5mm) | ||
- | * Ensure that the object scintillator is in good conditions | + | * Ensure that the object scintillator is in good condition |
* [[Turning magnets on off#Arming of Dump Switch|Arm dump switches]] | * [[Turning magnets on off#Arming of Dump Switch|Arm dump switches]] | ||
Line 19: | Line 19: | ||
* Make sure Intermediate PPACs have gas | * Make sure Intermediate PPACs have gas | ||
- | ===== In data U6 ===== | + | ===== In data U4 ===== |
- | * Start [[Software#u6pc5 (data U6)|Software applications]] (in computer | + | * Start [[Software#u4pc8 (data U4)|Software applications]] (in computer |
- | * Source the environment file to run the DAQ: | + | ==== Setting up DAQ software ==== |
- | * Open a terminal in u6pc5 and type '' | + | |
- | * Type '' | + | |
- | * Verify that **stagearea** | + | * For each experiment, an S800 Device Physicist will, after backing up whatever is to be backed up, install S800 DAQ and make it ready for the experiment. They do so as described in the following. |
+ | |||
+ | === Backup any updates === | ||
+ | |||
+ | * ~/ | ||
+ | * Compare files in the subdirectory Configurations (e.g. '' | ||
+ | * Manually add the modified files and commit the changes, and '' | ||
+ | |||
+ | === Uninstall existing files === | ||
+ | |||
+ | * '' | ||
+ | * '' | ||
+ | |||
+ | === Install existing files === | ||
+ | |||
+ | * '' | ||
+ | * The script should relink | ||
+ | |||
+ | === Set S800 DAQ mode === | ||
* Set S800 DAQ in [[s800 daq tools# | * Set S800 DAQ in [[s800 daq tools# | ||
* Check [[s800 daq tools# | * Check [[s800 daq tools# | ||
+ | |||
+ | ===== Other items ===== | ||
* [[Turning magnets on/off#Set magnet currents individually |Put 10 Amps in Spectrograph dipoles]] | * [[Turning magnets on/off#Set magnet currents individually |Put 10 Amps in Spectrograph dipoles]] | ||
Line 41: | Line 59: | ||
* [[Magnetic-rigidity setting|Set spectrograph Brho]] (coordinate with experimenters) | * [[Magnetic-rigidity setting|Set spectrograph Brho]] (coordinate with experimenters) | ||
+ | |||
+ | |||
+ | |||
+ | |||
+ | ===== At the end of the experiment ===== | ||
+ | * Verify with S800 Device Physicist that S800 DAQ software is uninstalled. This can be done by typing script '' | ||
+ | |||
+ | * Unbias detectors, CRDC interface boards, CRDCs gate, etc | ||
+ | |||
+ | * [[Gas handling system|Remove gas]] from CRDCs and Ion Chamber | ||